S98A/0807: Retention of existing single storey temporary accommodation adjoining the catering department, consisting of teaching accommodation for Trinity College and Hospital office accommodation.
Tallaght, Dublin 24
DecisionGrant permission
Decided28 January 1999
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tallaght, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD08A/01281 no. prefabricated office unit onto the existing flat roof at the first floor located in the Children's Department at the West of the hospital campus. The unit will have a total floor area of 110sqm and be a total height of 3.45m off the existing flat roof level. / 0.1 km away / 22 April 2008Granted
- SD16A/0226The provision of staff accommodation at Tallaght Hospital. The accommodation will include staff changing, general office space and a replacement crèche for the children of hospital staff. The 1,462sq.m building is proposed to be located to the rear of the hospital on a site bordered by the staff restaurant, the education building and Cookstown Way. The new building is to be placed beside the existing Cardiac Research in Youth (C.R.Y.) building and a physical link will be provided from the new accommodation back into the Hospital Street. The crèche is provided as a single storey element to the north west of the site. The remaining element which is proposed as a two storey will house office areas and staff changing and will be to the south east of the crèche. / 0.1 km away / 18 October 2016Granted
- SD13A/0077Three ground level single storey extensions to the Emergency Department resulting in an increase in gross floor area of approximately 1,053sq.m. along with ancillary site works and associated mechanical and electrical plant including a screened ground level mechanical and electrical plant compound approximately 82sq.m; the existing gross floor area of the Emergency Department is approximately 2,167sq.m. / 0.1 km away / 20 June 2013Granted
- SD13A/0138Alterations and extensions to the Radiology Department in an internal courtyard at the north west of the hospital comprising a single storey extension to accommodate a second magnetic resonance imaging (MRI) scanner; an extended control room and associated technical equipment room total floor area of proposed extension approx. 61sq.m.; a screened area on the roof of the technical equipment room extending onto part of the MRI room to accommodate mechanical ventilation equipment; a 4.5m high quench pipe; the relocation of the door from a sub-waiting area to the courtyard; construction of a door to the corridor at first floor level to provide access to the roof of the extension and the mechanical plant; provision of an air-conditioning condenser in the courtyard; reconfiguration of the hard and soft landscaping in the remainder of the courtyard. / 0.1 km away / 03 September 2013Granted
- SD21A/0014Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works. / 0.1 km away / 24 March 2021Granted
- SD04A/0937Erection of new six storey (5649m.sq.) healthcare research and teaching facility with atria, attached to existing health sciences building, relocation of existing gas enclosure, alterations to windows and doors to existing adjoining buildings and associated site works including revolving pedestrian entrance gate to Cookstown Way. Carparking is to be provided at lowest floor plan and mechanical plant and water storage at the top floor. / 0.1 km away / 10 June 2005Granted
- SD11A/0194(1) Retention of a 73sq.m. modular building for use as a file store at ground floor level adjacent to the x-ray department including associated site works; (2) Permission for a 76sq.m. modular building extension to file store at ground floor level adjacent to the x-ray department to include associated site works. / 0.1 km away / 11 October 2011Granted
- SD08A/0320The construction of a single storey electrical substation, comprising transformer room, switchrooms and vacuum plantroom, to be built into the existing landscaped bank at the west of the hospital campus adjacent to the site boundary with Cookstown Way, with assoicated site works. The unit will have a total floor area of 165sqm and a total height of 4.275 m from existing ground level. / 0.1 km away / 04 July 2008Granted