SD06A/0085: 3.0 wide and 80.0m long lay by bus stop to accommodate three buses.
Citywest Campus, N82 (CitywestRoad), Dublin 24
DecisionGrant permission
Decided06 April 2006
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Citywest Campus, N82 (CitywestRoad), Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD26A/0028WThe development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works. / 0.1 km away / 02 April 2026Granted
- SD05A/0146Business premises consisting of a two storey building with a total floor area of 2,246sq.m. to be used for production, warehouse or showroom purposes with integrated offices in any proportion of the above including all drainage, site works, car parking, external building services and landscaping on a site of circa. 1.2 acres: the site is part of the overall permitted development at Citywest Business Campus and other business developments for Citywest Ltd. / 0.2 km away / 31 May 2005Granted
- S99A/0907Two storey building. This building which will have a combined floor area of 2246 sq.m. for use as business accommodation for either showrooms, warehousing, offices or production in any proportion of the above, with a new entrance road and car parking on a site of approx. 1.2 acres. This site has the benefit of an overall permission 90A/2340 and is located at the east of the north/south distributor road through City West Business Campus, Brownsbarn, Naas Road, Dublin 24 with access from the distributor road through a local access road. / 0.2 km away / 15 February 2000Granted
- SD23A/0009Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground. / 0.2 km away / 16 March 2023Granted
- SD16A/0420Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha. / 0.2 km away / 18 April 2017Granted
- SD18A/024411 new car parking spaces to the front of the existing building with an enlargement to the surface water attenuation tank previously granted under Reg. Ref. SD17A/0112 together with associated site works. / 0.2 km away / 18 October 2018Granted
- SD24A/0028Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground. / 0.2 km away / 15 July 2024Granted
- SD14A/0007Retention of an internal mezzanine 130sq.m. area together with the removal of an existing loading door and the insertion of new window into west elevation. Permission for new porch around existing loading door to rear (south) elevation. / 0.2 km away / 14 March 2014Granted