SD16A/0420: Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.
Bianconi Avenue, Citywest Business Campus, Naas Road, Dublin 24
DecisionGrant permission
Decided18 April 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bianconi Avenue, Citywest Business Campus, Naas Road, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD24A/0028Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground. / 0.0 km away / 15 July 2024Granted
- SD06A/00853.0 wide and 80.0m long lay by bus stop to accommodate three buses. / 0.2 km away / 06 April 2006Granted
- SD23A/0009Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground. / 0.2 km away / 16 March 2023Granted
- SD05A/0146Business premises consisting of a two storey building with a total floor area of 2,246sq.m. to be used for production, warehouse or showroom purposes with integrated offices in any proportion of the above including all drainage, site works, car parking, external building services and landscaping on a site of circa. 1.2 acres: the site is part of the overall permitted development at Citywest Business Campus and other business developments for Citywest Ltd. / 0.2 km away / 31 May 2005Granted
- S99A/0907Two storey building. This building which will have a combined floor area of 2246 sq.m. for use as business accommodation for either showrooms, warehousing, offices or production in any proportion of the above, with a new entrance road and car parking on a site of approx. 1.2 acres. This site has the benefit of an overall permission 90A/2340 and is located at the east of the north/south distributor road through City West Business Campus, Brownsbarn, Naas Road, Dublin 24 with access from the distributor road through a local access road. / 0.2 km away / 15 February 2000Granted
- SD07A/0625Retention for permanent use of the existing car park under previous planning permission (S00A/0762) for five-year temporary car park. / 0.2 km away / 26 September 2007Granted
- S00A/0370Minor extension to the expansion of existing facility for which planning permission was grant (S99A/0908, April 10th 2000). The extension comprise additional area of entrance porch, re-location of one loading dock from the south facade of Block G to the west facade of Block K, additional link corridor and plant room at first floor level over existing boiler house, additional security control room at first floor level between Block G and the multi-storey car park. The total area of extensions is 212.3 sq.m. / 0.2 km away / 27 July 2000Granted
- SD16A/0064Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works. / 0.2 km away / 21 April 2016Granted