SD06A/1119: Construct industrial unit (10.2m high) comprising 1004sq.m. of light industrial area plus 618sq.m. of warehousing area plus 875sq.m. of ancillary office/staff afcilities on 2 floors totalling 2497sq.m. plus storage yard for construction plant and equipment, 7536 sq.m. together with services, utilities, landscaping, planting, paving, parking and site development works.
Site F, Aerodrome Business Park, Collegeland, Rathcoole, Co. Dublin.
DecisionGrant permission
Decided03 April 2007
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0709Construction of a vehicle wash bay, 60sqm with integrated screen wall and canopy 5.1m high plus associated drainage works to previously approved Site F. (Reg. Ref SD06A/1119) / 0.1 km away / 26 October 2007Granted
- SD07A/0528/EPAmend a previously permitted scheme (SD06A/0035) on this site of approx. 0.41 ha. (the original permission permits a warehouse building [530sqm] with yard for the purposes of storage/transhipment of goods associated with the warehouse use). Development now proposed consists of a waste recycling and recovery facility for the processing of up to 45,000 tonnes of waste per annum, consisting of three waste streams namely: Hydrocarbon Contaminated Waste (including interceptor waste, oily water, waste oil, coolants, cutting fluids, fuel oils and tank bottoms); Process/Industrial Wastes (including drain cleaning waste, acid/alkaline waste, neutralized waste, lime sludge leachate, process wash waters and bilge waste) and oil-contaminated solid materials (including spent oil filters and oily rags). It is also proposed that the facility be used for the short term storage of contaminated soils in skips and bulk bags at quantities not exceeding 1,000 tonnes per annum. The proposed development also consists of the completion of the concreting and bunding of the existing yards (which are partially already concreted and bunded) for purposes associated with the Waste Recycling and Recovering Facility; the provision of 4 no. external bunded storage tanks; internal alterations to provide for a kitchen (9sqm), changing and wash room (13sqm) and control room (15sqm) at ground floor level and the addition of a laboratory at first floor level (14sqm) in the existing building giving a total floor area of 565sqm (including stair cores and circulation space) which is now to be used primarily for the processing and treatment of waste; 2 no. separate extensions to the east of the existing building, the first being approx. 36m long, 18.9m wide by 9.55m high (650sqm), into which deliveries of unprocessed waste (into 3 no. underground sumps) are to be made (prior to pumping into 3 no. above-ground storage tanks), and the second extension being approx. 5.4m long, 7.5m wide by 8.4m high (36sqm), to be used for the short term storage of unprocessed waste in bulk containers and empty containers prior to removal off site. Both the proposed extensions are to match the existing building in external finish. The development also includes the provision of 1 no. weighbridge; 1 no. wash bay; 11 no. car parking spaces; modifications to the existing surface and foul drainage; landscaping; the demolition of 7.25m of existing rendered block wall for the purposes of widening an internal entrance within the site, and all other necessary site development and excavation works above and below ground. The application relates to development which comprises and is for the purposes of an activity requiring a waste license in accordance with the Waste Management Act, 1996. An Environmental Impact Statement (EIS) will be submitted to the planning Authority with the application. / 0.1 km away / 30 October 2012Granted
- SD07A/0528Amend a previously permitted scheme (SD06A/0035) on this site of approx. 0.41 ha. (the original permission permits a warehouse building [530sqm] with yard for the purposes of storage/transhipment of goods associated with the warehouse use). Development now proposed consists of a waste recycling and recovery facility for the processing of up to 45,000 tonnes of waste per annum, consisting of three waste streams namely: Hydrocarbon Contaminated Waste (including interceptor waste, oily water, waste oil, coolants, cutting fluids, fuel oils and tank bottoms); Process/Industrial Wastes (including drain cleaning waste, acid/alkaline waste, neutralized waste, lime sludge leachate, process wash waters and bilge waste) and oil-contaminated solid materials (including spent oil filters and oily rags). It is also proposed that the facility be used for the short term storage of contaminated soils in skips and bulk bags at quantities not exceeding 1,000 tonnes per annum. The proposed development also consists of the completion of the concreting and bunding of the existing yards (which are partially already concreted and bunded) for purposes associated with the Waste Recycling and Recovering Facility; the provision of 4 no. external bunded storage tanks; internal alterations to provide for a kitchen (9sqm), changing and wash room (13sqm) and control room (15sqm) at ground floor level and the addition of a laboratory at first floor level (14sqm) in the existing building giving a total floor area of 565sqm (including stair cores and circulation space) which is now to be used primarily for the processing and treatment of waste; 2 no. separate extensions to the east of the existing building, the first being approx. 36m long, 18.9m wide by 9.55m high (650sqm), into which deliveries of unprocessed waste (into 3 no. underground sumps) are to be made (prior to pumping into 3 no. above-ground storage tanks), and the second extension being approx. 5.4m long, 7.5m wide by 8.4m high (36sqm), to be used for the short term storage of unprocessed waste in bulk containers and empty containers prior to removal off site. Both the proposed extensions are to match the existing building in external finish. The development also includes the provision of 1 no. weighbridge; 1 no. wash bay; 11 no. car parking spaces; modifications to the existing surface and foul drainage; landscaping; the demolition of 7.25m of existing rendered block wall for the purposes of widening an internal entrance within the site, and all other necessary site development and excavation works above and below ground. The application relates to development which comprises and is for the purposes of an activity requiring a waste license in accordance with the Waste Management Act, 1996. An Environmental Impact Statement (EIS) will be submitted to the planning Authority with the application. / 0.1 km away / 29 August 2007Granted
- SD08A/0152Construction of a warehousing unit (17.45m high) totalling 4295sq.m. including 322sq.m. of ancillary office/staff facilities on 2 floors together with services, utilities, landscaping, planting, paving, parking and all assocaited site development works. / 0.1 km away / 29 April 2008Granted
- SD08A/0073A warehousing development (13.45m high) divided into a maximum of 3 no. units totalling 2924sq.m. including 507sq.m. of ancillary office / staff facilities, utilities, fencing, landscaping, planting, paving, parking and site development works. / 0.1 km away / 14 May 2008Granted
- SD23A/0191The development amends a permitted warehouse development (as granted under SDCC Reg. Ref. SD19A/0264 and SDCC Reg. Ref. SD21A/0276). Retention permission is sought for the following modifications: the provision of 3 No. gas tanks (c. 1.5 metres high) with associated fencing to the north of the site, resulting in the omission of 6 No. permitted HGV spaces; the addition of a sprinkler tank (c. 29 sq m) and pump room (c. 31 sq m) to the north-west of the site; the provision of entrance and wayfinding signage as follows: 2 No. signs at the northern entrance along the eastern boundary (1 metre high) and 2 No. signs at the southern entrance along the eastern boundary (1 metre high); 2 No. signs on the northern elevation of the constructed warehouse (3.9 metres high and 1 metre high); and 2 No. signs on the eastern elevation of the constructed warehouse (3.9 metres high and 1 metre high); boundary treatments; and all associated development works above and below ground. The proposed development amendments will principally consist of: the provision of crash protection barriers (c. 1.1 metres high) to the south, east and west of the constructed gas tanks; and all associated development works above and below ground. / 0.1 km away / 03 October 2023Granted
- SD19A/0264Warehouse with ancillary three storey office and staff facilities and associated development. The warehouse will have a parapet height of 17 metres with a gross floor area of 14,649sq.m including a warehouse area (13,494sq.m), ancillary office areas (1099sq.m) and staff facilities (56sq.m); provision of a new vehicular access/egress onto the Jordanstown Road; internal roadways; pedestrian access; 152 ancillary car parking spaces; bicycle parking; HGV yard including 26 HGV parking stands and 18 loading docks; hard and soft landscaping including green walls; lighting; photo-voltaic panels; ESB substation and switch room; plant; boundary treatments and associated development works above and below ground. / 0.1 km away / 10 October 2019Granted
- SD21A/0276Amendment to SDCC REF. SD19A/0264 comprising the omission of the 33 permitted Photovoltaic (PV) Solar Panels (53sq.m) to the ancillary office roof; provision of 400 Photovoltaic (PV) Solar Panels (717sq.m) to the warehouse roof; provision of an amended access arrangement including pedestrian and cyclist infrastructure to the staff/visitor carpark with the provision of an inter-com/FOB access point, central concrete aisle and gates; omission of 1 permitted car parking space (reducing the quantum of car parking from 152 to 151 spaces); the provision of 2 sections of strip window glazing to the northern elevation of the warehouse (each 37.4m in length and 1m in height); the provision of a soft surface outdoor exercise area; boundary treatments and all associated development works above and below ground. / 0.1 km away / 30 November 2021Granted