SD07A/0528/EP: Amend a previously permitted scheme (SD06A/0035) on this site of approx. 0.41 ha. (the original permission permits a warehouse building [530sqm] with yard for the purposes of storage/transhipment of goods associated with the warehouse use). Development now proposed consists of a waste recycling and recovery facility for the processing of up to 45,000 tonnes of waste per annum, consisting of three waste streams namely: Hydrocarbon Contaminated Waste (including interceptor waste, oily water, waste oil, coolants, cutting fluids, fuel oils and tank bottoms); Process/Industrial Wastes (including drain cleaning waste, acid/alkaline waste, neutralized waste, lime sludge leachate, process wash waters and bilge waste) and oil-contaminated solid materials (including spent oil filters and oily rags). It is also proposed that the facility be used for the short term storage of contaminated soils in skips and bulk bags at quantities not exceeding 1,000 tonnes per annum. The proposed development also consists of the completion of the concreting and bunding of the existing yards (which are partially already concreted and bunded) for purposes associated with the Waste Recycling and Recovering Facility; the provision of 4 no. external bunded storage tanks; internal alterations to provide for a kitchen (9sqm), changing and wash room (13sqm) and control room (15sqm) at ground floor level and the addition of a laboratory at first floor level (14sqm) in the existing building giving a total floor area of 565sqm (including stair cores and circulation space) which is now to be used primarily for the processing and treatment of waste; 2 no. separate extensions to the east of the existing building, the first being approx. 36m long, 18.9m wide by 9.55m high (650sqm), into which deliveries of unprocessed waste (into 3 no. underground sumps) are to be made (prior to pumping into 3 no. above-ground storage tanks), and the second extension being approx. 5.4m long, 7.5m wide by 8.4m high (36sqm), to be used for the short term storage of unprocessed waste in bulk containers and empty containers prior to removal off site. Both the proposed extensions are to match the existing building in external finish. The development also includes the provision of 1 no. weighbridge; 1 no. wash bay; 11 no. car parking spaces; modifications to the existing surface and foul drainage; landscaping; the demolition of 7.25m of existing rendered block wall for the purposes of widening an internal entrance within the site, and all other necessary site development and excavation works above and below ground. The application relates to development which comprises and is for the purposes of an activity requiring a waste license in accordance with the Waste Management Act, 1996. An Environmental Impact Statement (EIS) will be submitted to the planning Authority with the application.
Site 643, Greenogue Industrial Estate, Rathcoole, Co. Dublin
DecisionGrant extension of duration of permission
Decided30 October 2012
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0528Amend a previously permitted scheme (SD06A/0035) on this site of approx. 0.41 ha. (the original permission permits a warehouse building [530sqm] with yard for the purposes of storage/transhipment of goods associated with the warehouse use). Development now proposed consists of a waste recycling and recovery facility for the processing of up to 45,000 tonnes of waste per annum, consisting of three waste streams namely: Hydrocarbon Contaminated Waste (including interceptor waste, oily water, waste oil, coolants, cutting fluids, fuel oils and tank bottoms); Process/Industrial Wastes (including drain cleaning waste, acid/alkaline waste, neutralized waste, lime sludge leachate, process wash waters and bilge waste) and oil-contaminated solid materials (including spent oil filters and oily rags). It is also proposed that the facility be used for the short term storage of contaminated soils in skips and bulk bags at quantities not exceeding 1,000 tonnes per annum. The proposed development also consists of the completion of the concreting and bunding of the existing yards (which are partially already concreted and bunded) for purposes associated with the Waste Recycling and Recovering Facility; the provision of 4 no. external bunded storage tanks; internal alterations to provide for a kitchen (9sqm), changing and wash room (13sqm) and control room (15sqm) at ground floor level and the addition of a laboratory at first floor level (14sqm) in the existing building giving a total floor area of 565sqm (including stair cores and circulation space) which is now to be used primarily for the processing and treatment of waste; 2 no. separate extensions to the east of the existing building, the first being approx. 36m long, 18.9m wide by 9.55m high (650sqm), into which deliveries of unprocessed waste (into 3 no. underground sumps) are to be made (prior to pumping into 3 no. above-ground storage tanks), and the second extension being approx. 5.4m long, 7.5m wide by 8.4m high (36sqm), to be used for the short term storage of unprocessed waste in bulk containers and empty containers prior to removal off site. Both the proposed extensions are to match the existing building in external finish. The development also includes the provision of 1 no. weighbridge; 1 no. wash bay; 11 no. car parking spaces; modifications to the existing surface and foul drainage; landscaping; the demolition of 7.25m of existing rendered block wall for the purposes of widening an internal entrance within the site, and all other necessary site development and excavation works above and below ground. The application relates to development which comprises and is for the purposes of an activity requiring a waste license in accordance with the Waste Management Act, 1996. An Environmental Impact Statement (EIS) will be submitted to the planning Authority with the application. / 0.0 km away / 29 August 2007Granted
- SD06A/01322 No. warehousing blocks as follows: (1) Block A (9.225m high, divided into a maximum of 7 units) totaling 938sq.m. including 168sq.m. of ancillary office/staff facilities on ground floor with 168sq.m. of mezzanine above; (2) Block B (10.825m high) totaling 734sq.m. including 383sq.m. of ancillary office/staff facilities on 2 floors and 545sq.m. yard for the storage/transshipment of goods associated with the warehouse use together with services, utilities, fencing, landscaping, planting, paving, parking and site development works. / 0.1 km away / 15 June 2006Granted
- SD08A/0073A warehousing development (13.45m high) divided into a maximum of 3 no. units totalling 2924sq.m. including 507sq.m. of ancillary office / staff facilities, utilities, fencing, landscaping, planting, paving, parking and site development works. / 0.1 km away / 14 May 2008Granted
- SD06A/1119Construct industrial unit (10.2m high) comprising 1004sq.m. of light industrial area plus 618sq.m. of warehousing area plus 875sq.m. of ancillary office/staff afcilities on 2 floors totalling 2497sq.m. plus storage yard for construction plant and equipment, 7536 sq.m. together with services, utilities, landscaping, planting, paving, parking and site development works. / 0.1 km away / 03 April 2007Granted
- SD06A/0583Warehousing unit (16.500m high) totalling 2,778sq.m. including 281sq.m. of ancillary office/staff facilities on 3 floors together with services, utilities, landscaping, planting, paving, parking and site development works. / 0.1 km away / 01 September 2006Granted
- SD08A/01204m high security wall to existing yard to south side of existing building incorporating 4m high access gate within. / 0.1 km away / 15 April 2008Granted
- SD06A/0420Construction of a 6,965m2 yard for the storage of prefabricated modular buildings plus ancillary 2 storey 216m2 administration building (6.20m high), 98m2 part covered storage area (6.5m high) and single storey 23m2 canteen (3.2m high) together with services, utilities, landscaping, planting, paving, parking and associated site development works. / 0.2 km away / 20 July 2006Granted
- SD06A/0115Construct 2,849sq.m. warehouse unit (15.885m high) including 122msq.m. of ancillary office and staff facilities on 2 floors together with services, utilities, fencing, landscaping, planting, paving, parking and site development works. / 0.2 km away / 18 April 2006Granted