GrantedDecided 17 November 2010South Dublin County Council

SD10A/0283: Construction of a 4.5 MW geothermal electricity generation plant comprising a 9.5m high, 675sq.m. building; 2 x 4000m deep wells (production and injection); 3.51m high, 110sq.m. enclosure; external air cooling fans; underground water attenuation tank; 8 no. car parking spaces; formation of a new vehicular access and ancillary works including the erection of a 2.5m high boundary paladin fence; paving; hydrocarbon interceptor; ESB compound (2.6m high, 9sq.m.) and site development works within a planning application area of 3.5ha on a site previously granted planning permisison for 2 no. light industrial buildings (Register Reference SD07A/0580). Temporary construciton phase works to consist of a 42m high drilling rig mounted on a working pad, drilling mud circulation system (including an attenuation pond and drill cuttings storage area), covered water tank, 4 no. diesel generators, bunded diesel storage tank, cement silos; containerised compound for offices, canteen, workshops and portaloo toilets. An Environmental Impact Statement has been submitted in connection with this application.

Site 646, Greenogue Business Park, Rathcoole, Co. Dublin
DecisionGrant permission
Decided17 November 2010
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.