SD12A/0048: Construct a new GIS (Gas Insulated Switchgear) 110kV electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing ADSIL facility; (2) construction of an ESB GIS substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings.
DUB 9, Greenhills Road, Tallaght, Dublin 24
DecisionGrant permission
Decided09 May 2012
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near DUB 9, Greenhills Road, Tallaght, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0901Retention of change of use from manufacturing unit to wholesale and distribution unit with ancillary office and trade counter. / 0.1 km away / 14 January 2008Granted
- SD14A/0091Demolition of an existing single storey office building; construction of a new two storey extension (4,491sq.m.) to the existing DUB09 building for use as electrical rooms for electronic operations and mechanical plant rooms; works will include external roof top engineering plant with associated visual screening, revised levels of the existing site to facilitate the new extension and sundry associated works. / 0.1 km away / 17 June 2014Granted
- SD11A/0268Upgrade of existing boundary fencing/railings; revised site entrance locations and layouts; new security hut and upgrading of the site security system to include red-wall system, CCTV, public lighting poles and associated underground services. Retention of a temporary 10MVA ESB substation of 31sq.m. facing onto Greenhills Road. / 0.1 km away / 13 January 2012Granted
- SD11A/0116Retention for Phase 1 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The works under Planning Retention will consist of the following: (1) Phase 1 demolition of existing asbestos roof and replacement with new roof cladding; (2) the demolition of an internal proportion of the existing building to allow for a new internal access road to the loading bay and future mechanical air handling equipment. (3) the demolition of an existing external lean-to pallet storage facility to the west face of the building; (4) demolition of a section of existing single storey auxiliary office building to the west. (5) Phase 1 internal works to the existing facility consist of 6 no. rooms for electrical and electronic operations, Loading Bay, Workshop, Offices and Staff Welfare area; (6) Phase 1 construction of a single storey security facility to the North elevation of the existing building; (7) Phase 1 construction of new external wall cladding to a proportion of the North and West elevation of the building; (8) Phase 1 screening to external mechanical air handling equipment and stand-by generator units; (9) auxiliary sprinkler and storage water tanks, pump house and provision for a new oil storage tank. Permission for Phase 2 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The proposed works under Planning Permission will consist of the following: (1) Phase 2 demolition of the existing asbestos roof and replacement with new roof cladding; (2) Phase 2 construction to complete new cladding to North, South, East and West elevations of the building; (3) Phase 2 construction of the plant screening to external Mechanical Air Handling and Stand-by Generator Units - the screen is to be constructed on the east, north, and west elevations of the facility; (4) Phase 2 internal works to the existing facility will consist of 24 no. rooms for electrical and electronic operations and Staff Welfare area. / 0.1 km away / 24 June 2011Granted
- SD16A/0402Construction of a new boundary railing to the main road frontage and an increase in height to the existing fencing on the east and west boundaries of the overall site. / 0.1 km away / 20 January 2017Granted
- SD06A/0799Sub division of existing warehouse into 3 units with new first floor to each unit, alterations to front and rear elevations, replacement of existing roof. / 0.1 km away / 13 March 2007Granted
- SD21A/0221New vehicular service yard entrance at side. / 0.2 km away / 29 September 2021Granted
- SD16A/0339Demolition of an existing link between warehouse/office Units14/15, dividing the connected units into two separate self-contained warehouse/office units, and to provide a new pedestrian entrance to the front of Unit 15. / 0.2 km away / 18 November 2016Granted