SD16A/0402: Construction of a new boundary railing to the main road frontage and an increase in height to the existing fencing on the east and west boundaries of the overall site.
DUB 9, Greenhills Road, Tallaght, Dublin 24
DecisionGrant permission
Decided20 January 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near DUB 9, Greenhills Road, Tallaght, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD14A/0091Demolition of an existing single storey office building; construction of a new two storey extension (4,491sq.m.) to the existing DUB09 building for use as electrical rooms for electronic operations and mechanical plant rooms; works will include external roof top engineering plant with associated visual screening, revised levels of the existing site to facilitate the new extension and sundry associated works. / 0.0 km away / 17 June 2014Granted
- SD11A/0268Upgrade of existing boundary fencing/railings; revised site entrance locations and layouts; new security hut and upgrading of the site security system to include red-wall system, CCTV, public lighting poles and associated underground services. Retention of a temporary 10MVA ESB substation of 31sq.m. facing onto Greenhills Road. / 0.0 km away / 13 January 2012Granted
- SD11A/0116Retention for Phase 1 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The works under Planning Retention will consist of the following: (1) Phase 1 demolition of existing asbestos roof and replacement with new roof cladding; (2) the demolition of an internal proportion of the existing building to allow for a new internal access road to the loading bay and future mechanical air handling equipment. (3) the demolition of an existing external lean-to pallet storage facility to the west face of the building; (4) demolition of a section of existing single storey auxiliary office building to the west. (5) Phase 1 internal works to the existing facility consist of 6 no. rooms for electrical and electronic operations, Loading Bay, Workshop, Offices and Staff Welfare area; (6) Phase 1 construction of a single storey security facility to the North elevation of the existing building; (7) Phase 1 construction of new external wall cladding to a proportion of the North and West elevation of the building; (8) Phase 1 screening to external mechanical air handling equipment and stand-by generator units; (9) auxiliary sprinkler and storage water tanks, pump house and provision for a new oil storage tank. Permission for Phase 2 refurbishment of the existing warehouse facility, to construct screening of mechanical plant, to carry out ancillary site works and construct ancillary site facilities to the site. The proposed works under Planning Permission will consist of the following: (1) Phase 2 demolition of the existing asbestos roof and replacement with new roof cladding; (2) Phase 2 construction to complete new cladding to North, South, East and West elevations of the building; (3) Phase 2 construction of the plant screening to external Mechanical Air Handling and Stand-by Generator Units - the screen is to be constructed on the east, north, and west elevations of the facility; (4) Phase 2 internal works to the existing facility will consist of 24 no. rooms for electrical and electronic operations and Staff Welfare area. / 0.0 km away / 24 June 2011Granted
- SD07A/1023Change of use of ground floor from industrial/warehouse in to restaurant and take away and new shop front and signage. / 0.1 km away / 19 March 2008Granted
- SD12A/0048Construct a new GIS (Gas Insulated Switchgear) 110kV electricity substation and to carry out ancillary site works: (1) all necessary site works for construction of a concrete compound area to the southwest of the existing ADSIL facility; (2) construction of an ESB GIS substation control building within the fenced compound area; (3) construction of a client control building and a transformer bay to house two transformers within the compound area; (4) construction of a 6m wide concrete access road within the perimeter of the site area; (5) installation of all substation apparatus within the compound area and buildings. / 0.1 km away / 09 May 2012Granted
- SD09A/0070Change of use from office & commercial unit to an Irish Muslim Centre including information office, Muslim cultural social event centre for education classes & pastel office at ground floor & prayer rooms, library & stores at first floor. / 0.1 km away / 15 April 2009Granted
- SD04A/0290Works to existing industrial unit (a) Construction of a new mezzanine first floor with new office spaces (b) New metal cladding to roof and sides. (c) Alterations to front and side elevations with new windows and doors. (d) New perimeter fencing (e) New E.S.B. sub-station. / 0.2 km away / 22 June 2004Granted
- SD17A/0147Change of use of part of ground and first floor of premises from industrial/warehouse use to sports club/facility use. / 0.2 km away / 06 July 2017Granted