GrantedDecided 23 June 2015South Dublin County Council

Unit 4, Westgate Business Park, Ballymount, Dublin 24

Planning application SD15A/0116
DecisionGrant permission
Decided23 June 2015
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by South Dublin County Council.
Modification of previously approved fencing (Ref No: SD14A/0229) along the northwest side of the property to include the erection of a palisade fence on a concrete plinth ( total height = 2400mm) inside the boundary line, with 1220mm high steel columns/bollards set inside part of the fencing, and with electric fence (total height = 4000mm) & 1220m high steel columns/bollards set inside the remaining part of the fencing. The erection of a palisade fence on a concrete plinth (total height = 2400mm) with electric fence (total height = 4000mm) & 1220mm high steel columns/bollards set inside the fencing, to the left of the northeast elevation of the existing building, and along the southeast, and southwest sides of the property. The section of fencing to the left of the northeast elevation of the existing building will incorporate 1 sliding gate including an automated opening and closing function. The erection of a projecting angled electric fence (total height = 1000mm) fixed to the face of all elevations of the existing building near the parapet along the perimeter of the roof. The erection of 4 steel columns (total height = 5000mm) to the roof of the existing building to supoort steel cables for the prevention of attack by helicopter. The construction of a 153.1sq.m single storey extension at the existing 2 vehicle access doors to southwest/rear of the building to create 2 vehicle security access traps. The parapet height of the extension will match the parapet height (7,890mm approximately) of the existing canopy covering the area outside the current vehicle access points. 3 bollards, that are electro-automated to retract into ground to be installed outside each of the 2 vehicle access traps. 1 new escape door to the northwest elevation. 1 new escape door to the southwest elevation. Associated works.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Unit 4, Westgate Business Park, Ballymount, Dublin 24?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.

Source documents

Original council portal records and source PDFs where available.

1 council document — in the €39 site risk brief

Site brief

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →