GrantedDecided 01 July 2015South Dublin County Council

SD15A/0123: Construction of a pre-fabricated, 2 storey building with a single storey link to existing buildings to comprise on the ground floor: a science room and prep room, 3 classrooms, communal corridor, toilets, passenger lift, link corridor and accommodation stairs, and on the first floor: 5 classrooms, toilets, communal corridor, passenger lift, accommodation staircase and external fire escape stairs with connections to the existing foul water drainage system and the provision of an on-site surface water disposal system, together with all other ancillary and associated site works. The increased and shared use of the existing gate controlled set down/pick-up area off Castle Road/Esker Meadow View, adjacent to Gaelscoil Phadraig, for the benefit of the 3 schools and the creation of a new section of pedestrian/cycle pathway connecing the existing footpath/cycle lane from Griffeen Road on the south boundary through the Colaiste Cois Life site to the existing footpath at the west site boundary with Esker Educate Together National School.

Colaiste Cois Life, Castle Road, Lucan, Co. Dublin.
DecisionGrant permission
Decided01 July 2015
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.