SD24A/0194W: Extending the existing the school with a single storey office & administration extension to the south of the building, and a single storey classroom extension to the east of the building. The works will also include alterations to the interior of the existing building to accommodate a new accessible WC and food preparation area. The works will include all associated ancillary works, landscaping and services.
Montessori Matters, 108 Esker Manor, Lucan, Co. Dublin, K78 AE93
DecisionGrant permission
Decided27 November 2024
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- S01A/0423Protect and carry out minor works on graveyard boundary wall which is a protected structure and abuts the subject site. To demolish existing bungalow, derelict two storey dwelling and out buildings and to build on resultant cleared site circa 2.2 hectares, 99 no. 2/3 storey residential units to contain / 8 no. 3 bed semi-detached units / 16 no. 2/3 be courtyard house units / 48 no. 2/3 bed duplex blocks / 27 no. 2 bed apartment units / 2 no. semi basement car parking decks with a total of 43 no. spaces and 85 no. surface car parking, provision for creche (single storey, 148 sq.m with 5 no. surface car parking spaces, ancillary landscaping and play area) landscaping and ancillary works. / 0.0 km away / 05 February 2003Granted
- SD04A/0177To make modifications to permission (Reg. Ref. No: S01A/0423)(PI06S.131067) at Esker, Lucan, Co. Dublin, which comprised of 97 no. residential units and creche on site circa 2.2 hectares. It is proposed to include 10 no. additional residential units contained in duplex blocks 1,2,3,4,5. Duplex Block 1: to contain 11 no. residential units consisting of 1 no. 1 bed apartment, 6 no. 2 bed apartments, 4 no. 3 bed townhouses, (balconies to Southern elevation of Block 1). Duplex Block 2: to contain 13 no. residential units consisting of 1 no. 1 bed apartment, 7 no. 2 bed apartments, 5 no. 3 bed townhouses. (Balconies to Northern elevation of Block 2). Duplex Block 3: to contain 14 no. residential units consisting of 2 no. 1 bed apartment, 8 no. 2 bed apartments, 4 no. 3 bed townhouses. (Balconies to Northern/Southern elevation of Block 3). Duplex Block 4: to contain 14 no. residential units consisting of 10 no. 2 bed apartments, 4 no. 3 bed townhouses. (Balconies to Southern elevation of Block 4). Duplex Block 5: to contain 12 no. residential units consisting of 8 no. 2 bed apartments, 4 no. 3 bed townhouses. (Balconies to Western elevation of Block 5). All on site. / 0.0 km away / 12 May 2004Granted
- SD02A/05514,776 sq. metre part single storey, part two storey, Irish language post-primary school, incorporating general and practical classroom accommodation, administrative offices, sports hall and supporting ancillary accommodation, for 650 students and staff all with associated ground works, external play areas, staff and visitor car parking. The proposed premises will accommodate the existing Colaiste Cois Life school, all on a 2.27 hectare (5.61 acres) site, (adjacent to the existing pre-fab premises), served by Griffeen Road (to the south) and Castle Road (to the north). / 0.1 km away / 28 August 2003Granted
- SD06A/0143Modification of the existing entrance roadway with the provision of a new roundabout and set down area for two buses and four on street carparking spaces in front of Gaelscoil Padraig National School, the provision of a new pedestrian path and street lighting and new entrance gates and railings. The proposed road layout at Colaiste Cois Life is to be changed to provide a new roundabout and set down area for three buses and four cars, 30 staff carparking spaces, an overflow carpark for 24 cars, a new sub-station and new entrance gates and railings. / 0.1 km away / 29 May 2006Granted
- SD15A/0123Construction of a pre-fabricated, 2 storey building with a single storey link to existing buildings to comprise on the ground floor: a science room and prep room, 3 classrooms, communal corridor, toilets, passenger lift, link corridor and accommodation stairs, and on the first floor: 5 classrooms, toilets, communal corridor, passenger lift, accommodation staircase and external fire escape stairs with connections to the existing foul water drainage system and the provision of an on-site surface water disposal system, together with all other ancillary and associated site works. The increased and shared use of the existing gate controlled set down/pick-up area off Castle Road/Esker Meadow View, adjacent to Gaelscoil Phadraig, for the benefit of the 3 schools and the creation of a new section of pedestrian/cycle pathway connecing the existing footpath/cycle lane from Griffeen Road on the south boundary through the Colaiste Cois Life site to the existing footpath at the west site boundary with Esker Educate Together National School. / 0.1 km away / 01 July 2015Granted
- SD20A/0048Retention of: (a) relocation of Block A constructed under planning Ref. SD16A/0209; (b) relocation and minor facade amendments of Block B constructed under planning Ref. SD16A/0209; (c) relocation of Block C constructed under planning Ref. SD17A/0123; (d) relocation and minor facade amendments of Block D constructed under planning Ref. SD17A/0123; (e) increase of width of existing pedestrian access route from Esker Manor originally constructed under planning Ref. SD15A/0123 to form new secured pedestrian and Fire Tender access route including new access gates on Esker Manor and associated works & site works. / 0.1 km away / 29 April 2020Granted
- SD17A/0123Retention of Block C - 1 single storey detached temporary accommodation structure located to the south of the site, consisting of 2 classrooms, 1 home economics room, 1 art room, associated access ramps/steps & fencing, connection to existing foul and storm sewers and Permission for the following: (a) Block D – 1 two storey detached temporary accommodation structure located to the south of the site, consisting of 7 classrooms, 1 science classroom, 1 technology room and toilet blocks with connection to the existing foul and storm water drainage; (b) conversion of a classroom within existing Block A to form a store and an access corridor and to the proposed Block D together with a covered walkway between existing Block A and proposed Block D; (c) Block E – 1 single storey detached temporary accommodation structure located to the south of the site containing 1 office with connection to the existing storm drainage; (d) additional car parking located to the north west of the site and (e) all associated site works. / 0.1 km away / 13 June 2017Granted
- SD16A/0209Retention of (a) Block A – 1 single storey detached temporary accommodation structure, consisting of 4 classrooms measuring 188.50sq.m; (b) Block B – 1 single storey detached temporary accommodation structure, consisting of 1 science classroom, preparation room and toilet block measuring 170sq.m; (c) connection to the existing foul and surface drainage system and planning permission for the provision of an on-site surface water disposal system, together with all ancillary accommodation and associated site works. / 0.1 km away / 03 August 2016Granted