SD15A/0241: 6 telecommunications antennas, associated RRU units, 2 link dishes and associated ancillary equipment on existing rooftop, including ancillary site works and proposed equipment cabinets located in existing lift shaft equipment room under, at Tallaght Hospital, (The Adelaide and Meath Hospital, Dublin), Tallaght, Dublin 24. The development will form part of Vodafone Ireland Ltd.’s existing GSM and 3G Broadband telecommunications network, and provide improved services on their 3G / 4G Broadband Networks.
AMNCH, Tallaght Hospital, Tallaght, Dublin 24.
DecisionRefuse permission
Decided29 September 2015
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD15A/01226 telecommunications antennas and associated ancillary equipment on existing rooftop, including ancillary site works and proposed equipment cabinets located in existing lift shaft equipment room under. The development will form part of Vodafone Ireland Ltd's existing GSM and 3G broadband telecommunications networks and provide improved services on their 3G/4G broadband networks. / 0.0 km away / 26 June 2015Refused
- SD09B/0210Retention of single storey extension constructed to the rear of existing two storey, end of terrace dwelling house, to retain alterations to the front elevations of same, all ancillary site works and services. / 0.2 km away / 23 July 2009Refused
- SHD3ABP-305725-19(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. / 0.3 km away / 13 February 2020Refused
- SD03A/0243Erection of 7 no. parking signs which consist of 3 no. bracket signs, 4 no. face fixed signs together with and 4 no. general building signs in association with the provision of 493 no. public parking spaces on Level 1 and Level 2. / 0.3 km away / 22 January 2004Refused
- SD18B/0423Extend pedestrian gate to 2.3 metres, dish kerb and create pathway over adjacent green area. / 0.3 km away / 03 December 2018Refused
- SD17B/0094A three meter wide recessed vehicular access gate to rear garden and associated dropped crossing of kerbs and strengthening of footpath. / 0.3 km away / 08 May 2017Refused
- SD16A/0270Mixed residential and commercial development (GFA 38,207.1sq.m) providing a total of 246 apartments in 2 separate buildings, 3 commercial units, 2 community rooms, 2 crèches and 2 ESB substations, along with landscaped courtyards (containing a surface bicycle store to each site), underground car parking, providing an overall total of 233 parking spaces, refuse stores and plant areas. Site A with frontages to Fourth Avenue and Cookstown Road comprises a total of 148 apartments (14 studios, 27 one bed, 95 two bed and 12 three bed), all with private balcony spaces in a building with a maximum height of 7 stories. (Total GFA of 23,483.4m2). 2 commercial units of 333m2 and 197m2, 1 community room of 44.8m2 and 1 crèche of 194.6m2 with dedicated open space, are proposed at ground floor level. An ESB substation is proposed at ground floor level to service site A. The landscaped courtyard contains bicycle store for 44 bicycles. An underground carpark serviced off Fourth Avenue, contains 148 car parking spaces (of which 19 are disabled) and refuse stores. Site B with a frontage to Cookstown Road comprises a total of 98 apartments (10 studios, 26 one bed, 54 two bed and 8 three bed) all with private balcony spaces in a building with a maximum height of 7 stories (total GFA of 14,723.7m2). 1 community room of 29.8m2 and 1 crèche of 147m2 with dedicated open space, are proposed at ground floor level. An ESB substation is proposed at ground floor level to service Site B. The landscaped courtyard contains bicycle store for 94 bicycles. An underground carpark serviced off Cookstown Road contains 85 carparking (of which 13 are disabled) spaces and refuse stores. Proposals also included the provision of a new road linking the existing Cookstown Road to Belgard Square North, a new road to Southern boundary of Unit 69, a new pedestrian walkway to the Southern boundary of Units 66 and 67, (which will also allow for the servicing of the proposed ESB substation for Site A) and the provision of a new public park (0.7175ha). The development also includes the demolition of all existing industrial units and all associated site development works. / 0.3 km away / 14 September 2016Refused
- SD06A/1089Sundry revisions to permitted development Reg. Ref. SD03A/0421, SD04A/0938, SD05A/0805 & SD06A/056. The provision of an additional floor plate to Block 1A being an increase from 5 floors to 6 floors and provisions of a glazed link between Blocks 3 B and 1A from second to fifth floor, all representing an additional floor area of 987.74 sq.m; stair lobby revision to Block 3B; the infill of floor void to hotel mezzanine (Block 2) representing additional floor area of 47.15 sq.m; minor revisions to hotel elevations (Block 2) and provision of keg store basement - 1. The total area of development is 89,566.1 sqm which represents an increase of 1034.9sq.m. on the 88,531.2 sq.m. previously permitted under Reg Reference SD06A/0561. The application site comprises 2.775 hectares. / 0.3 km away / 21 February 2007Refused