Units 66 & 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
Planning application SHD3ABP-305725-19
DecisionRefuse permission
Decided13 February 2020
Application typeSHD3-Application to ABP
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Units 66 & 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SD16A/0270Mixed residential and commercial development (GFA 38,207.1sq.m) providing a total of 246 apartments in 2 separate buildings, 3 commercial units, 2 community rooms, 2 crèches and 2 ESB substations, along with landscaped courtyards (containing a surface bicycle store to each site), underground car parking, providing an overall total of 233 parking spaces, refuse stores and plant areas. Site A with frontages to Fourth Avenue and Cookstown Road comprises a total of 148 apartments (14 studios, 27 one bed, 95 two bed and 12 three bed), all with private balcony spaces in a building with a maximum height of 7 stories. (Total GFA of 23,483.4m2). 2 commercial units of 333m2 and 197m2, 1 community room of 44.8m2 and 1 crèche of 194.6m2 with dedicated open space, are proposed at ground floor level. An ESB substation is proposed at ground floor level to service site A. The landscaped courtyard contains bicycle store for 44 bicycles. An underground carpark serviced off Fourth Avenue, contains 148 car parking spaces (of which 19 are disabled) and refuse stores. Site B with a frontage to Cookstown Road comprises a total of 98 apartments (10 studios, 26 one bed, 54 two bed and 8 three bed) all with private balcony spaces in a building with a maximum height of 7 stories (total GFA of 14,723.7m2). 1 community room of 29.8m2 and 1 crèche of 147m2 with dedicated open space, are proposed at ground floor level. An ESB substation is proposed at ground floor level to service Site B. The landscaped courtyard contains bicycle store for 94 bicycles. An underground carpark serviced off Cookstown Road contains 85 carparking (of which 13 are disabled) spaces and refuse stores. Proposals also included the provision of a new road linking the existing Cookstown Road to Belgard Square North, a new road to Southern boundary of Unit 69, a new pedestrian walkway to the Southern boundary of Units 66 and 67, (which will also allow for the servicing of the proposed ESB substation for Site A) and the provision of a new public park (0.7175ha). The development also includes the demolition of all existing industrial units and all associated site development works. / 0.1 km away / 14 September 2016Refused
- SD13A/0041Additional use of part of premises (area 755 sq.m) as a 'Refuse Transfer Station' for WEEE and associated batteries; this additional use will also require the holding of a Waste Facility Permit. / 0.1 km away / 02 May 2013Refused
- SD21A/0052Demolition of the existing warehouse unit (1,632sq.m) and the construction of a new 5-6 storey building, accommodating 64 apartments, comprised of 20 1-bed apartments, 16 2-bed apartments, 8 3-bed apartments, 20 2-bed duplex apartments and 1 unit at ground floor level to be either retail or cafe. The proposed development also provides for a podium and an undercroft car parking area, at ground floor level, accommodating 37 car parking spaces, 167 bicycle parking spaces, bin storage, plant room and 2 ESB substations. Vehicular access to the development will be from the Cookstown Road. The development includes all private and communal open spaces, landscaping, boundary treatments, vehicular and pedestrian site access, bin storage, bike storage, signage and all associated site development works including service connections, foul and surface water drainage/attenuation and water supply/storage. On a total site area of approx. 0.28ha (0.7acres). / 0.2 km away / 26 April 2021Refused
- SD03A/0243Erection of 7 no. parking signs which consist of 3 no. bracket signs, 4 no. face fixed signs together with and 4 no. general building signs in association with the provision of 493 no. public parking spaces on Level 1 and Level 2. / 0.2 km away / 22 January 2004Refused
- SD15A/02416 telecommunications antennas, associated RRU units, 2 link dishes and associated ancillary equipment on existing rooftop, including ancillary site works and proposed equipment cabinets located in existing lift shaft equipment room under, at Tallaght Hospital, (The Adelaide and Meath Hospital, Dublin), Tallaght, Dublin 24. The development will form part of Vodafone Ireland Ltd.’s existing GSM and 3G Broadband telecommunications network, and provide improved services on their 3G / 4G Broadband Networks. / 0.3 km away / 29 September 2015Refused
- SD15A/01226 telecommunications antennas and associated ancillary equipment on existing rooftop, including ancillary site works and proposed equipment cabinets located in existing lift shaft equipment room under. The development will form part of Vodafone Ireland Ltd's existing GSM and 3G broadband telecommunications networks and provide improved services on their 3G/4G broadband networks. / 0.3 km away / 26 June 2015Refused
- SD20A/0239Single storey temporary emergency accommodation structure for working staff, for a maximum period of 2 years, comprising 16 sleep pods, a kitchen/dining area, cleaning and changing rooms and toilet facilities, all associated windows and doors and associated site development works. / 0.3 km away / 12 November 2020Refused
- SD17A/0463Construction of 11 metre high warehouse extension to rear of existing 7 metre high warehouse building. / 0.3 km away / 03 August 2018Refused