John F Kennedy Road, John F Kennedy Industrial Estate, Dublin 12, D12 CF34
Planning application SD22A/0366
DecisionGrant permission
Decided16 November 2022
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near John F Kennedy Road, John F Kennedy Industrial Estate, Dublin 12, D12 CF34?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- S01A/0629Construct an underground reinforced concrete tank (415 cubic metres) for the seperating of water mixed with waste oil to the rear of premises. / 0.0 km away / 08 February 2002Granted
- SD20A/0141Upgrade to the existing permitted sludge storage sump and bunded liquid waste storage area. This upgrade will consist of retention of an increase in height of the pre-existing reinforced concrete wall in order to raise the wall around the east, west and rear elevations to a uniform height of 2.64m, and permission for the construction of a single skin cladded roof to cover this storage area of 170sq.m, construction of single skin cladded sides from the top of the reinforced concrete walls at the east, west and rear elevations to the roof. The enclosure will remain open at the front elevation. The covered area will slope from a height of 6.49m at the front elevation to a height of 3.92m at the rear elevation. The activity being carried out at the site is one that requires an Industrial Emissions Licence from the EPA. / 0.0 km away / 05 January 2021Granted
- SD22A/0106Installation of 279 solar PV panels on the roof of the Eatto building. / 0.1 km away / 08 June 2022Granted
- SD06A/0831To construct a new 65.47sq. m. ground floor extension to the side of existing premises including internal alterations, to erect a new grey palisade fence 2.4 metres high with entrance gates to replace existing low level wall to the front boundary and new grey palisade fence 2.4 metres high to the side boundary. / 0.1 km away / 20 November 2006Granted
- SD22A/0374A new storage lobby extension to the side/rear of the Eatto building, Unit 220. / 0.1 km away / 25 November 2022Granted
- SD14A/0118Retention of existing timber framed and timber clad pigeon loft set off the ground on top of existing steel shipping containers in commercial yard. / 0.1 km away / 18 February 2015Granted
- S02A/0047Refurbishing, altering and extending existing industrial premises to include; raising and replacement of existing asbestos roofing with profiled metal roof sheeting, use of profiled metal cladding to raised sides, addition of new first floor offices over existing single storey offices, new external signage and new site perimeter, palisade type security fencing and gates. / 0.1 km away / 22 March 2002Granted
- S98A/0825Extension, height increase, alterations, new cladding and roofing, 1st floor offices to existing industrial unit. / 0.1 km away / 19 April 1999Granted