SD24A/0196W: The proposed development, Innovate Health, Centre of Excellence in Brain Health and Dementia, which will consist of: The demolition (in part) of the existing concrete beams adjoining the neighbouring unit and relocation of existing underground services. A five-storey building with part six-storey elements and set-back accommodation and plant rooms. (c. 6,590m²). The building functions comprise a reception area, café/restaurant, central atrium, radiology department, treatment, assessment and consultation rooms, research facilities, associated offices and meeting rooms and associated staff facilities, plant and storage rooms. Roof terrace at Level 05 at the south end of the building. Extract flues above roof level for laboratory ventilation. The removal of 14 car park spaces in the existing adjacent TUH car park to facilitate a new Entrance Park consisting of hard and soft landscaping and lighting. New footpath, signage, loading bay and accessible parking space off Fourth Avenue. New footpath, signage, set down area and two accessible parking spaces off the internal hospital campus road to the west. Extended footpath to the west of the adjacent car park and new pedestrian crossing to enhance pedestrian access to the existing multi-storey car park. New pedestrian crossing to connect the new Entrance Park with the main entrance to Tallaght University Hospital. Secure enclosed staff bike store to the North and visitor bike racks in the Entrance Park. Bin store to east side of building. Boundary fencing, walls and gates to east of site. The new facility will employ an extension to Tallaght University's Hospital current waste license. All associated ancillary site development and drainage works.
Fourth Avenue, Cookstown Industrial Estate, Adjoining & Bounded by Tallaght University Hospital, Tallaght, Dublin 24, D24 K599
DecisionGrant permission
Decided05 December 2024
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD18A/0197Construction of a new car park to provide 85 parking spaces, controlled taxi-rank, covered bicycle parking zone, new covered walkway located adjacent to the main hospital entrance together with alterations to the existing road, footpath, retaining wall & car park to provide an additional 5 disabled use bays including all associated site works. / 0.0 km away / 20 July 2018Granted
- SD17A/0430The construction of a new entrance lobby and concourse of total 250sq.m. additional floor area and 6m in height, including new information desk, informal seating area and display facilities. The proposal includes: (a) modifications to existing main entrance external wall and roof to create continuous 6m high new concourse extending from new entrance doors into the existing 4-storey high Atrium; (b) demolitions including removal of existing entrance canopy (20x7m) and removal of entire existing linear canopy (c.220m length) over the pedestrian walk way at road frontage; (c) associated external works including landscaping works, drainage and new paving; (d) new sign fixed above new entrance lobby doors. / 0.1 km away / 02 February 2018Granted
- SD10A/0299Change of use from an existing industrial unit to a Hindu Cultural Centre to include new mezzanine floor, change to elevations and all associated site works. / 0.1 km away / 17 February 2011Granted
- SD17A/0436Single storey first floor extension to the existing Intensive Care Unit (ICU) consisting of twelve isolation bedrooms, associated ancillary spaces, public waiting and overnight areas and staff areas. The proposed will be located on the roof of the existing ground floor outpatients department (existing roof finishes to be removed), connecting to the existing ICU at two locations, to an existing circulation route in one location and to the existing hospital street at one location. There will be no second floor accommodation with the exception of open air plant, screened plant and associated services with access for maintenance staff. / 0.1 km away / 06 February 2018Granted
- SD07A/0651Minor alterations to the main entrance and atrium area of the hospital comprising a one bay 38m2 draught lobby extension enclosing part of the existing entrance canopy, associated hard landscaping and minor alterations to an adjacent section of the existing elevation. / 0.1 km away / 01 October 2007Granted
- SD02A/0767Change of use of an existing permitted warehouse/office building to waste transfer facility and change of use of part of existing yard to storage/parking of skip. A waste permit application will be submitted in relation to this planning application. / 0.1 km away / 20 February 2003Granted
- SD05A/0121Single storey 912m2 hospital extension and a single storey 236m2 extension to the pharmacy. / 0.1 km away / 13 June 2005Granted
- SD03A/0018Medical gas storage enclosures. / 0.1 km away / 05 March 2003Granted