Ballyboe, Ballypatrick, Clonmel
Planning application 18601257
DecisionConditional grant
Decided26 November 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyboe, Ballypatrick, Clonmel?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560732The as-constructed roadway and access onto the local road (L2504) and PERMISSION for construction of a fence and gate / 0.4 km away / 20 October 2025Granted
- 17600898To retain an existing dormer extension and reconstruction, existing replacement entrance, to complete those works including new velux windows to front roof of the original house, replace existing front boundary fence in front of this house and associated site works / 0.6 km away / 02 October 2017Granted
- 18600815To retain indefinitely, the development as constructed for two no single storey agricultural buildings, built around a Courtyard, containing: 1. The construction of a stables building (for 16 horses – Area: 555sqm) 2. The construction of a hay barn (Area: 125sqm) 3. The demolition of the existing stables building (Area: 52sqm) and the construction of a staff area, storage and examination room (Area: 197sqm) 4. Liquid effluent storage tank 5. Storm water soakaways. All with the associated site development works within the curtilage of Anner Castle, Ballinamore, Clonmel, Co. Tipperary, a Protected Structure NIAH – 22207713 / Recorded Monument (No: TS077-089) / 0.7 km away / 14 August 2018Granted
- 19600807Fill the existing gravel pit and reinstate to levels including all associated site development works. This site is within the attendant grounds of Anner Castle, Ballinamore, a Protected Structure R.P.S. 2/N.I.A.H. Ref. 22207713 / 0.7 km away / 04 September 2019Granted
- 2461091The removal of the existing timber staircase in the North Tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under planning reference no. 2361015). All with the associated site development works. A protected structure NIAH – 22207713/recorded monument (no: TS077-089) / 0.8 km away / 12 February 2025Granted
- 2361015The fitting-out of Anner Castle as a private residence following the completed fabric restoration in 2019 (Planning Ref: 14/600555) to include the following: a) 8 bedrooms and associated bathrooms, b) wheelchair accessible lift, c) refurbishment and extension of the existing north staircase, d) the completion of the 2 number ancillary circulation staircases, e) new foul water treatment system and all with the associated site development works. This is a Protected Structure NIAH – 22207713 / Recorded Monument (No: TS077-089) / 0.8 km away / 10 April 2024Granted
- 21572Demolition of existing single storey extension and construct part 2 storey part single storey extension, raise roof of existing dwelling, upgrade wastewater system to current EPA standards, construct wing walls and piers to existing entrance and all other associated site works / 1.0 km away / 18 June 2021Granted
- 21403Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW / 1.0 km away / 21 May 2021Granted