Ballyboe, Clonmel, Co. Tipperary
Planning application 21403
DecisionConditional grant
Decided21 May 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyboe, Clonmel, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19600239A 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW compositing of photovoltaic panels on ground mounted frames with associated infrastructure including 4 No. Inverter Housing cabins, 1 No. control building, 1 No. customer cabin (substation), 1 No. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. The planning application will be accompanied by a Natura Impact Statement / 0.0 km away / 25 September 2019Granted
- 2460661The construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works / 0.4 km away / 12 December 2024Granted
- 2460634The construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and All necessary associated site works and services / 0.5 km away / 09 December 2024Granted
- 2260070The following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works / 0.6 km away / 06 April 2022Granted
- 201074Construction of 1) a new storey and half dwelling 2) new domestic garage 3, new site entrance, driveway and modification to hedgerow 4) waste water treatment system and all associated site works / 0.7 km away / 21 January 2021Granted
- 2560732The as-constructed roadway and access onto the local road (L2504) and PERMISSION for construction of a fence and gate / 1.0 km away / 20 October 2025Granted
- 18601257Construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services / 1.0 km away / 26 November 2018Granted
- 211449Filling the remaining void in the existing quarry and reinstate to levels / 1.1 km away / 22 November 2021Granted