Ballyboe, Ballypatrick, Co.Tipperary
Planning application 2460661
DecisionConditional grant
Decided12 December 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyboe, Ballypatrick, Co.Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21403Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW / 0.4 km away / 21 May 2021Granted
- 19600239A 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW compositing of photovoltaic panels on ground mounted frames with associated infrastructure including 4 No. Inverter Housing cabins, 1 No. control building, 1 No. customer cabin (substation), 1 No. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. The planning application will be accompanied by a Natura Impact Statement / 0.4 km away / 25 September 2019Granted
- 18600229The following development: construct an extension to the side of existing dwelling, including all associated site development works to facilitate the proposed development / 0.8 km away / 10 April 2018Granted
- 211424Demolition of an existing two storey dwelling and for the construction of a single storey replacement dwelling with associated effluent treatment plant and percolation area. And all associated site development works including alterations to existing site entrance and associated roadside boundary set-back. / 0.8 km away / 17 November 2021Granted
- 2560732The as-constructed roadway and access onto the local road (L2504) and PERMISSION for construction of a fence and gate / 0.9 km away / 20 October 2025Granted
- 2460634The construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and All necessary associated site works and services / 0.9 km away / 09 December 2024Granted
- 2260070The following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works / 1.0 km away / 06 April 2022Granted
- 18601257Construction of an extension to ground floor areas and refurbish existing farmhouse, including all associated site works and services / 1.1 km away / 26 November 2018Granted