Ballynagrana, Carrick on Suir, Co. Tipperary
Planning application 19600907
DecisionConditional grant
Decided03 October 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Tipperary County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballynagrana, Carrick on Suir, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19601148A single storey extension, bedroom and shower to the side of my dwelling house and all associated site works / 0.5 km away / 15 January 2020Granted
- 211304Detached garage and for change of use of part of the detached garage to workshop for use by our son Conor Whelan as a part time hurley making workshop / 0.5 km away / 23 May 2022Granted
- 211819Alterations to the previously granted solar farm (Tipperary County Council Reg Ref 17600928) Permission was originally granted for a solar photovoltaic installation comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameeras around the solar PV arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha. Permission is now sought for the following: optimised solar pv panel configuration to comprise up to 23,581 m" of solar panels on ground mounted frames; increase in height to the permitted solar panels from 2.72m to 2.82m and; Permission for an operational period of the solar farm from 35 years. Planning Permission is sought for a period of 10 years / 0.6 km away / 16 February 2022Granted
- 17600928Development consisting of a solar photovoltaic (PV) installation with a maximum installed capacity of 3.6MW, comprising arrays of approximately 13,770 solar PV panels on ground mounted frames no taller than 2.8m; 2 no. inverter/transformer container units; a battery storage container unit; a 20kV on-site substation; landscaping, fencing and CCTV cameras around the solar PV arrays; underground cabling and ducts within the arrays and connecting to the off-site Deerpark ESB substation; provision of a temporary construction compound; widening of the existing farm entrance and internal tracks; and all ancillary works on a site of 9.12 ha / 0.6 km away / 22 January 2018Granted
- 2360952As constructed log cabin and the dog house, including all associated site development works / 0.6 km away / 31 January 2024Granted
- 19600120The provision of three battery storage containers which are required for the operation of the previously granted solar farm (Planning Ref 16600640). This planning application also includes an alteration to the approved planning boundary and the operational permission of the solar farm to be increased from 25 to 30 years / 0.9 km away / 26 July 2019Granted
- 211818Alterations to the previously granted solar farm in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary (Tipperary County Council Reg Ref. 16600640, and An Bord Pleanála Reg Ref. PL92.248089) as amended by Tipperary County Council Reg Ref. 19600120. Permission was originally granted for a solar photovoltaic installation comprising up to 36,500 m2 of solar panels on ground mounted frames, 6 no. inverters housed in 3 units, 1 no. 20kV substation, security fencing, new entrance onto public road, CCTV; underground cable and ducts including cable and ducts along the public road to the entrance of the existing Deerpark substation within the townland of Deerparklodge, Carrick-on-Suir, Co. Tipperary and all associated ancillary development works and services. Permission was subsequently granted for three battery storage containers, alterations to the approved planning boundary and the operational permission of the solar farm from 25 to 30 years. Permission is now sought for the following; optimized solar pv panel configuration to comprise of up to 33,203 m2 of solar panels on ground mounted frames; increase to the length of the 20 kV substation from 9.98m to 11.975m to allow installation of required electrical equipment; increase in height to the permitted solar panels from 2.72 m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. The site is located in the townlands of Ballynagrana and Deerparklodge, Carrick-on-Suir, Co. Tipperary. A Natura Impact Statement (NIS) accompanies this application. Planning Permission is sought for a period of 10 years / 0.9 km away / 16 February 2022Granted
- 201595Construction of stables shed with straw/hay storage area with underground effluent tank and all associated site works / 1.0 km away / 24 February 2021Granted