Application description published by Tipperary County Council.
A large scale residential development (LRD), the site is bounded at the South by the R691 Dualla Road, Crottys Lane to the North, undeveloped residential zoned lands to the West and private residences to the East boundary - the development will consist of the erection of 101 dwellings, a childcare facility, construction of a new roundabout and link road and ancillary works on a gross site area of 3.96ha. The proposed development will be accessed from the new roundabout on the R691 Dualla Road and is more specifically described as follows: • 12 no. one- bedroom maisonettes in two-storey semi-detached blocks, • 49 no. three-bedroom two storey semi-detached houses, • 2 no.three-bedroom two storey terraced houses, • 1 no four-bedroom two storey semi-detached house, • 11 no four-bedroom two storey detached houses, • 6no. two-bedroom two-storey terraced houses, • 9 no one-bedroom apartments and 11 no 2 bedroom apartments in a 3 storey building, • a childcare facility (Creche) gross floor space 240m2, refuse stores and secure bicycle store all located within the ground floor of the apartment building, • 201 car parking spaces, (164 residential, and 37 for visitors and creche), creche set down area, secure outdoor creche play area, 20 secure cycle spaces and 20 visitor cycle spaces (bicycle stand), • the proposed development will include new entrances leading onto the R691 Dualla Road to the South of the application site and L54151 Crotty’s Lane to the North, construction of a new link road between Dualla Road to the south of the application site and Crotty’s Lane to the North and alterations to the R691 Dualla Road to include new roundabout, new raised tables and pedestrian crossings, • private, communal and public landscaped amenity spaces, internal estate road network, pedestrian pavement network including new internal pedestrian pavements extending to the North and South boundaries of the proposal, inter-site boundary walls and fences, new site boundary walls and fences, undergrounding of existing overhead electricity supply cables traversing the development site, erection of a new ESB sub station, public lighting, public drainage and water services connections and associated site development works
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-319736-24Submitted 16 May 2024 / decided 18 September 2024
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2361010
Received
20 December 2023
Decided
19 April 2024
FI requested
Yes
Authority
Tipperary County Council
Application type
PERMISSION
Outcome
Conditional grant
Source status
Documents indexed. Reason extraction for Tipperary has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Tipperary has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Hughes Lot East, Cashel, Co. Tipperary?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.