Greenan, Kilmacthomas, County Waterford
Planning application 22163
DecisionConditional grant
Decided26 April 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Waterford City and County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Waterford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Greenan, Kilmacthomas, County Waterford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1863To erect a dwelling house, detached garage, sewage treatment system and all ancillary works / 0.4 km away / 27 March 2018Granted
- 2360277For the restoration of part of an exhausted quarry void located within the former rock quarry at Carroll’s Cross in the townland(s) of Greenan and Ballyshanock. The application area will be ca. 4.7 hectares and the void which will be subjected to restoration covers an area of ca. 2.37ha. The development will consist of the restoration of the void with either: 1) Inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will result in the Proposed Development operating as a soil recovery facility that requires a waste management licence from the EPA; or, 2) Soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product at its source of origin and transported as a by-product material to enable the Site to be restored. The Site would then operate under conditions of planning. The proposed works will also involve the removal of an existing silo onsite, the relocation of a groundwater monitoring well, installation of road pipe culvert in the Dawn River and amendments to the existing culvert crossing the Waterford Greenway (including the construction of onsite access ramps approaching the existing culvert either side of the Greenway), along with ancillary works and landscaping. The area of the Site which will be restored currently comprises of exposed and disturbed rock from past quarry activities. The Site will be restored to species rich grassland which may be subjected to low level grazing. A planning permission of 15 years is being sought for the Proposed Development. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) which will be available for inspection. The Development will take place at The / 0.5 km away / 08 February 2024Granted
- 20316For a concrete batch manufacturing facility consisting of the following; one concrete batching plant unit including a control cabin, four no. cement silos (to 15 metres in height), six no. storage bins, a reserve water tank, a truck wash out area with settlement tanks used for water collection and recycling, 2,750m2 storage yard and associated landscaping and ancillary service all contained within 2.2 hectares of the Roadstone Carrolls Cross facility. The existing ancillary quarry facilities such as wheelwash, weighbridge and site entrance will continue to be used to service the development. The development is situated in the townlands of Greenan and Ballyshonock, Kilmacthomas, Co. Waterford. A Natura Impact Statement (NIS) will accompany the Planning Application / 0.6 km away / 21 January 2021Granted
- 21845For the refurbishment of the existing cottage including raising the roof to allow a storey and a half, the addition of gable windows and rooflights to the front, elevational changes to the front façade, the construction of a rear storey and a half extention with dormer window and rooflights, the widening of the existing driveway entrance and the installation of a new waste water treatment system and polishing filter, the construction of a garage workshop and all associated site works at / 0.6 km away / 07 December 2021Granted
- 19399To construct two fattening pig houses and a bunded concrete base for liquid feed tanks and associated site works. A Natura Impact Statement and Environmental Impact Report are submitted with the application. The site of the proposed development has an IPPC License Ref. No. PO686-01. / 0.8 km away / 31 October 2019Granted
- 17506To retain extension to dwelling, to retain domestic store and to retain alterations to the site boundaries and all ancillary site works / 0.9 km away / 29 August 2017Granted
- 21886For (a) permission and (b) retention for (i) retention permission for a period of three years for a single storey welfare facilities building located to the west of the existing building (ii) indefinite retention permission for a single storey plantroom building located to the rear of the existing building (iii) planning permission to construct three single storey extensions. The extensions are located on the south west and south east elevation of the existing building (iv) planning permission to extend the mechanical platform located to the rear of existing building. This site operates under an Integrated Pollution Control Licence Ref No. P1088-01. All ancillary site works associated with the above development at / 1.0 km away / 09 November 2021Granted
- 24137Change of use of part of the building from Cold Storage presently to that of a Packaging/Processing Area. Permission to demolish the existing Inspection Room and Canteen to be replaced by a new Canteen & Amenities building, to partition off the packaging/processing area, construct a Mezzanine First Floor with an Access stairs and lift and replace the present Ground Floor slab incorporating drainage together with all associated site works / 1.1 km away / 14 August 2024Granted