Former Roadstone Carrolls Cross Quarry, Greenan and Ballyshanock, Waterford
Planning application 2360277
DecisionConditional grant
Decided08 February 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Waterford City and County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Waterford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Former Roadstone Carrolls Cross Quarry, Greenan and Ballyshanock, Waterford?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20316For a concrete batch manufacturing facility consisting of the following; one concrete batching plant unit including a control cabin, four no. cement silos (to 15 metres in height), six no. storage bins, a reserve water tank, a truck wash out area with settlement tanks used for water collection and recycling, 2,750m2 storage yard and associated landscaping and ancillary service all contained within 2.2 hectares of the Roadstone Carrolls Cross facility. The existing ancillary quarry facilities such as wheelwash, weighbridge and site entrance will continue to be used to service the development. The development is situated in the townlands of Greenan and Ballyshonock, Kilmacthomas, Co. Waterford. A Natura Impact Statement (NIS) will accompany the Planning Application / 0.2 km away / 21 January 2021Granted
- 21845For the refurbishment of the existing cottage including raising the roof to allow a storey and a half, the addition of gable windows and rooflights to the front, elevational changes to the front façade, the construction of a rear storey and a half extention with dormer window and rooflights, the widening of the existing driveway entrance and the installation of a new waste water treatment system and polishing filter, the construction of a garage workshop and all associated site works at / 0.3 km away / 07 December 2021Granted
- 21886For (a) permission and (b) retention for (i) retention permission for a period of three years for a single storey welfare facilities building located to the west of the existing building (ii) indefinite retention permission for a single storey plantroom building located to the rear of the existing building (iii) planning permission to construct three single storey extensions. The extensions are located on the south west and south east elevation of the existing building (iv) planning permission to extend the mechanical platform located to the rear of existing building. This site operates under an Integrated Pollution Control Licence Ref No. P1088-01. All ancillary site works associated with the above development at / 0.4 km away / 09 November 2021Granted
- 22163Demolish existing dormer dwelling, to decommission existing septic tank, to construct a replacement dwelling which is to be a dormer style dwelling, wastewater treatment system, percolation area, alterations to existing entrance from public road to improve sightlines, and all ancillary site works / 0.5 km away / 26 April 2022Granted
- 24137Change of use of part of the building from Cold Storage presently to that of a Packaging/Processing Area. Permission to demolish the existing Inspection Room and Canteen to be replaced by a new Canteen & Amenities building, to partition off the packaging/processing area, construct a Mezzanine First Floor with an Access stairs and lift and replace the present Ground Floor slab incorporating drainage together with all associated site works / 0.6 km away / 14 August 2024Granted
- 1863To erect a dwelling house, detached garage, sewage treatment system and all ancillary works / 0.9 km away / 27 March 2018Granted
- 2360082Planning permission for the construction of a garage along with all associated site works at Ballyshunnock, Kilmacthomas, Co. Waterford. / 1.0 km away / 20 April 2023Granted
- 19245The construction of a new single storey house, a waste water treatment system, a bored well and an entrance along with all associated site works / 1.0 km away / 30 May 2019Granted