IDA Athlone Business & Technology Park, Garrycastle Dublin Road, Athlone
Planning application 177148
DecisionConditional grant
Decided18 December 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near IDA Athlone Business & Technology Park, Garrycastle Dublin Road, Athlone?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460103Development which will consist of the provision of 1m high bollard lighting located on a median strip separating a cycleway and new footpath respectively (both of which are determined by Westmeath County Council under their Section 5 Declaration reg. ref. S5-19-23 to be exempted development), connection to existing electricity network, and associated works / 0.1 km away / 27 May 2024Granted
- 21361Permission for the existing waste facility (waste permit reference number: WFP-WM-2016-0004-01) including existing warehouse building (626.6sqm), weighbridge office (17.7sqm), site office (23.4sqm), two weighbridges, two electric stop barriers, staff carpark, portable toilets, existing access onto the Washhouse road, boundary walls and fencing, yard lighting and associated services / 0.2 km away / 21 October 2021Granted
- 207025(1) The construction of a shell and core only, three-storey extension to the existing facility, approximately 60m long by 46m wide & 21m high, with a total floor area of approx. 2,425sqm to be located to the west side of the existing production facility (2) The addition of one temporary single-storey loading dock and canopy to the north side of the existing production facility, footprint approx. 75sqm (3) Construction of one single-storey ESB switch room approx. 21.5m long 6m wide & 5m high, with a total floor area of approx. 128sqm to be located on the west side of the site (4) Relocation of one existing single storey water pump house, approx. 45m to the west of its current location to facilitate the construction of a new internal access roadway, floor area approx. 49sqm & approx. 4.5m high, 7m wide & 7m long (5) One proposed new single-storey water pump house, floor area approx 49sqm & approx 4.5m high, 7m wide & 7m long (6) One proposed fire water tank 11.6m in diameter, approx. 8m high and with an approx footprint of 106sqm (7) New chillers and vessel yard, approx total area of 220sqm (8) New bunded diesel tank & emergency generator adjacent to the proposed ESB switch room, to the west side of the site (9) New internal service roads & pathways, including service yards, with all associated site works (10) The addition of new 3m high security perimeter fencing to the new site boundary (11) A new car park comprising 92 new car parking spaces to be located across the existing IDA access road to the east of the existing Aerie facility, to include new car park entrance from secondary access road, including lighting, new hard and soft landscaping and all associated site works. A Natura Impact Statement (NIS) accompanies this application, and will be available for inspection at the office of the planning authority / 0.2 km away / 14 April 2020Granted
- 177083The proposed development consists of an internal mezzanine within the curtilage of the existing facility housing plant and equipment sized 845 square meters, a single storey electrical building sized 66 square meters and 6.1 meters high, a single storey sprinkler pump house sized 91 square meters and 6 meters high with its associated water tank, both located to the rear of the existing facility. The works include a 3 meter high security fence and gates to the rear of the facility. The development relates to alterations and external works to the previously permitted Advanced Technology Building by IDA Ireland, Planning Reference No 13/7048 / 0.2 km away / 19 June 2017Granted
- 21107Construction of an on-grade car park to accommodate 160 car spaces including site lighting, drainage and landscaping with a modified vehicle and pedestrian entrance off the R916 comprising wider internal access ramp. The proposal also includes a pedestrian link between the existing controlled pedestrian crossing on the R916 and the main campus comprising an opening to be formed in the existing campus boundary wall, a stairs and ramp off the R916 and an internal campus footpath. / 0.2 km away / 27 April 2021Granted
- 2460297Development which will consist of a change of elevation to the above building, reconfiguration of existing classrooms and staff office and the provision of a new electrical workshop and PLC and Machine Lab. The works include alterations to the existing elevations and all ancillary site works / 0.2 km away / 08 January 2025Granted
- 21172Permission for the demolition of existing metal clad open storage area and the construction of a single storey flat roof Craft Apprentice Facility Classroom extension comprising two classrooms together with staff office and materials store circa 162 sq.m. total floor area, with roof mounted plant and parapet wall together with all associated site works / 0.3 km away / 31 May 2021Granted
- 21689Commercial building(an advanced technology unit) as constructed and all associated site works / 0.3 km away / 12 April 2022Granted