A.I.T East Campus, Dublin Road, Athlone
Planning application 21172
DecisionConditional grant
Decided31 May 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Westmeath County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Westmeath has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near A.I.T East Campus, Dublin Road, Athlone?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21107Construction of an on-grade car park to accommodate 160 car spaces including site lighting, drainage and landscaping with a modified vehicle and pedestrian entrance off the R916 comprising wider internal access ramp. The proposal also includes a pedestrian link between the existing controlled pedestrian crossing on the R916 and the main campus comprising an opening to be formed in the existing campus boundary wall, a stairs and ramp off the R916 and an internal campus footpath. / 0.1 km away / 27 April 2021Granted
- 187213Construction of a 3 storey extension to the existing Midlands Innovation and Research Centre, as part of the Athlone Institute of Technology Campus. The extension comprises of 919sqm of office/technology and innovation accommodation-located over 2 floors, which links through to the existing innovation and research building, with a screened enclosed plant area at the roof level. The proposed development includes relocation of the existing 12 no. car park spaces, and provision for 10 no. new car park spaces-both to be located to the rear of the site, 10 no. new bicycle spaces and associated site works and landscaping / 0.1 km away / 16 January 2019Granted
- 2460297Development which will consist of a change of elevation to the above building, reconfiguration of existing classrooms and staff office and the provision of a new electrical workshop and PLC and Machine Lab. The works include alterations to the existing elevations and all ancillary site works / 0.1 km away / 08 January 2025Granted
- 21361Permission for the existing waste facility (waste permit reference number: WFP-WM-2016-0004-01) including existing warehouse building (626.6sqm), weighbridge office (17.7sqm), site office (23.4sqm), two weighbridges, two electric stop barriers, staff carpark, portable toilets, existing access onto the Washhouse road, boundary walls and fencing, yard lighting and associated services / 0.1 km away / 21 October 2021Granted
- 177148The development will consist of construction of a 293 metre section of new road to connect the existing Business & Technology Park internal road network to the new roundabout on the R916 to the northwest of the Business & Technology Park. The new road will provide a second access to the Business & Technology Park and will open up the IDA lands in the northwest of the Business & Technology Park for future development. The road will comprise a 7.0m wide 2-lane carriageway with 2 no 2m Grass Verges, 2 no 1.8m paved footways and 1 no 2.25m two land cycle track; together with public lighting and underground services. The road will be mainly in cut but will involve an embankment incorporating a 1.8m high and 2.1m wide culvert for the River Al / 0.3 km away / 18 December 2017Granted
- 2460103Development which will consist of the provision of 1m high bollard lighting located on a median strip separating a cycleway and new footpath respectively (both of which are determined by Westmeath County Council under their Section 5 Declaration reg. ref. S5-19-23 to be exempted development), connection to existing electricity network, and associated works / 0.3 km away / 27 May 2024Granted
- 207099Material alterations and change of use of the existing first floor gymnasium and changing areas of the John Count McCormack Centre into a new Medical and Counselling facility with a gross floor area of 222sqm comprising new consultation rooms, reception, waiting rooms and support spaces. Alterations to the east façade comprising insertion of new windows at first floor level and roof alterations comprising new rooflights and roof-mounted plant. / 0.3 km away / 04 September 2020Granted
- 2510Extension of duration for demolition of the existing building on site and provision of a new Advance Technology Building. Permission is also sought for signage, car parking, cycle shelter, landscaping, underground water storage tank, ESB substation/switch room and all associated site works / 0.3 km away / 05 June 2025Granted