North & Northeast of Kish Business Park, Arklow, Co. Wicklow
Planning application 201088
DecisionConditional grant
Decided29 April 2021
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons26conditions8nearby records
Proposed development
Application description published by Wicklow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Permission refers to development as described, revised by details submitted 08/03/2021.Compliance
- 2Developer to pay €3,139,835 development contribution @ €47/m2 for 66,805 sqm GFA. Index-linked if unpaid.Development Contribution
- 3Cash security of €200,000 for reinstatement of public roads damaged by construction, index-linked.Traffic Access
- 4No development commences until all condition submissions/agreements agreed in writing by Planning Authority.Compliance
- 5Appoint Chartered Engineer to report to Compliance Engineer on compliance (roads, services, landscaping, finishes, dust/noise).Construction Management
- 6Establish management company for maintenance, landscaping, treatment plant, funded pro-rata by unit owners.Construction Management
- 7Implement all EIAR mitigation measures, supervised by qualified personnel.Environment Ecology
- 8Submit Construction Management Plan (traffic, noise, dust, fuel containment, waste, hours, surface water control) agreed prior to commencement.Construction Management
- 9Obtain written agreement of Irish Water for water services. Permission does not commit Council to provision.Water Services
- 10Sink replacement well and fence off from ICT facility per submitted plans. Submit drinking water test results before decommissioning existing well.Compliance
- 11Car parking: 5m x 2.5m spaces, 6m aisles, surfaced/lined. Car park reserved solely for vehicles, open during operation.Traffic Access
- 12Provide minimum 3 disabled spaces (3m x 4.8m) and 20 EV charging spaces.Traffic Access
Planning a project near North & Northeast of Kish Business Park, Arklow, Co. Wicklow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Inside the decision file
Extracts from the council's own decision documents for this application — 95 pages of searchable text on file.Chief Executives Order2 pages indexed
\{ CIL PLANNING & DEVELOPMENT ACTS 2000 (as amended) Planning, Dev & Env. Order No: 709/2021 y! Reference Number 20l1 088 nl O Name of Applicant Crag Wicklow Limited es Address: c/o John Spain Associates os 39 Fitzwilliam Place Dublin 2 rp Pu Nature of Application: proposed Ten year permission for the following, g '...
Final Grant2 pages indexed
Cocnbatile Cor>cae C.btW cy>bnocAio Aras An Chontae / County Buildrngs ((liqclotrl Cocrnq Courlsll Cill Mhantdin / Wicklow Guthdn /Tel (0404) 20148 Faics / Fax: (0404]' 69462 Rphost / Email: plandev@wicklowcoco.i Forbaift Plean5la agus Comhshaot Suiomh / Website: www.wicklow.ie Planning Development and Environment y!...
Planners Report27 pages indexed
Planner's report for planning register reference 2OltO88 (G/planning/Soll/Dcreports/) y! DEVELOPM ENT MANAG EM ENT nl PLANNING DEPARTMENT O WICKLOW COUNTY COUNCIL es os Development Proposed Ten year permission for the following, o Demolition of existing outbuildings on the subject site along with all site clearance...
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Chief Executives OrderSource: wicklowcoco.eplanning.ie / 92a5b80e-7077-49ce-b5bb-d8e11cccd571.pdf / Document 385402Source PDF
- Final GrantSource: wicklowcoco.eplanning.ie / C8543680-6c7b-4617-b916-c4ff71a0bc85.pdf / Document 391625Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / 39ca36a0-c608-4616-b8f7-32807d1aefac.pdf / Document 385405Source PDF
- Planners ReportSource: wicklowcoco.eplanning.ie / F63b2e51-914c-432c-bbde-b93e8379b09c.pdf / Document 385406Source PDF
- F I Request LetterSource: wicklowcoco.eplanning.ie / 245b8b48-b634-4b30-bfca-6a728ccd80ea.pdf / Document 367903Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360167Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application / 0.2 km away / 27 October 2023Granted
- 2560484Construction of a garage to the rear of their property and the Planning Permission for the construction of a covered carport to the rear of the property together with associated and ancillary site works / 0.3 km away / 18 June 2026Granted
- 2488Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development / 0.3 km away / 17 July 2024Granted
- 2362Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works / 0.4 km away / 14 March 2023Granted
- 2460614Saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works / 0.4 km away / 26 November 2024Granted
- 191322Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works / 0.4 km away / 06 February 2020Granted
- 18128356 sqm of existing first floor office and external window and full permission for office (gross area 120 sqm) and windows at second floor, new fire escape at ground floor, additional parking and all associated site works / 0.4 km away / 15 January 2019Granted
- 21677Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application / 0.4 km away / 15 November 2021Granted