Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 22 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a period of 10 years for development of this site. The proposed development will consist of the provision of the following: I. 3 no. wind turbines with an overall turbine tip height of 156.5 metres; a rotor blade diameter of 133 metres; and hub height of 90 metres, and associated foundations, hard-standing and assembly areas; II. Continued use of the existing onsite 38kV substation and associated 38kV underground cabling (built under Cork County Council Ref. No. 00/6590 / An Coimisiún Pleanála Ref. No. 04.127297); III. A meteorological mast with a height of 30 metres above ground and associated foundation and hard-standing area; IV. All associated underground electrical and communications cabling connecting the wind turbines and meteorological mast to the existing onsite 38kV substation; V. A temporary construction compound (including 2 no. site offices and staff facilities (with a combined floor area of 60 sq.m); VI. A borrow pit; VII. Peat and spoil management; VIII. Upgrade of existing site tracks / roads and provision of new site access roads, junctions and hardstand areas; IX. Temporary improvements and modifications to the existing site access junction off the R584 to facilitate delivery of turbine components; X. Upgrade of an existing access track off the R584, including temporary improvements and modifications to facilitate a turbine component turning area; XI. Tree Felling and Vegetation Removal; XII. Biodiversity Enhancement measures (Kerry Slug habitat enhancement, peatland habitat enhancement, and riparian planting of native broadleaf trees); XIII. Site Drainage; XIV. Operational stage site signage; and XV. All associated site development works, ancillary works and apparatus. A 35-year operational life from the date of the full commissioning of the wind turbines and subsequent decommissioning of the development is being sought. An Environmental Impact Assessment Report (EIAR) and Naura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this planning application. Cead a iarraidh ar feadh tréimhse 10 mbliana, chun an suíomh seo a fhorbairt sna bailte fearainn Doirín Dún Aodha, An Currach Glas, An Cheapach Bhuí Bheag, agus An Inse Mhór, Co. Chorcaí. Cuimseofar na nithe seo leanas san bhForbairt Bearthaithe; I. 3 thuirbín gaoithe le huasairde barr tuirbín de 156.5 méadar; trastomhas lann rótair de 133 méadar; agus airde moil de 90 méadar, agus na boinn, na limistéir chrua-sheasta agus na limistéir tionóil ghaolmhara; II. Úsáid leanúnach an fhostáisiúin 38kV atá ar an Suíomh cheana féin agus an cháblaíocht faoi thalamh 38kV gaolmhar (tógtha faoi Uimhir Thagartha Chomhairle Contae Chorcaí 00/6590 / Uimhir Thagartha an Choimisiúin Phleanála 04.127297); III. Crann meitéareolaíochta atá 30 méadar ar airde os cionn na talún agus an bunús agus an limistéar crua-sheasta gaolmhar; IV. An cháblaíocht leictreach agus cumarsáide faoi thalamh gaolmhar go léir a nascann na tuirbíní gaoithe agus an crann meitéareolaíochta leis an bhfostáisiún 38kV atá ann cheana féin ar an Suíomh; V. Compún tógála sealadach (lena n-áirítear 2 oifig suímh agus áiseanna foirne, (le hachar urláir comhcheangailte de 60 méadar cearnach); VI. Sloc iasachta; VII. Bainistiú móna agus cartadh; VIII. Uasghrádú ar rianta/bóithre suímh atá ann cheana féin, agus soláthar bóithre rochtana suímh nua, acomhail agus limistéir chrua-sheasta; IX. Feabhsuithe agus modhnuithe sealadacha ar an acomhal rochtana suímh atá ann cheana féin amach ón R584 chun seachadadh ualaí neamhghnácha a éascú; X. Uashghrádú ar an mbóthar rochtana atá ann cheana féin amach ón R584, lena n-áiritear feabhsuithe agus modhnuithe chun limistéar casadh comhpháirteanna tuirbíne a éascú; XI. Leagan Crann agus Baint Fásra; XII Bearta Feabhsúcháin Bithéagsúlachta (feabhsú gnáthóige drúchtín ballach, feabhsú gnáthóige portaigh, agus plandáil crainn dhúchasacha leathanduilleacha bruachánach); XIII. Draenáil Suímh; XIV. Comharthaíocht ar s
A ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning) and will consist of the following i. Up to 7 no. wind turbines with an overall blade tip height of up to 178.5 metres and all associated foundations and hard-standing areas; ii 2 no. borrow pits; iii 1 No. permanent meteorological mast with a maximum height of up to 112 metres; iv. Upgrade of existing and provision of new site access roads; v. Upgrade to existing access junction; vi. A 38kV electricity substation, including 4 no. battery storage containers, 1 no. control building with welfare facilities, associated electrical plant and equipment, security fencing, and waste water holding tank; vii. Forestry Felling; viii. A temporary construction compound; ix. Site Drainage; x. All associated internal underground cabling, including underground grid connection cabling to the existing overhead line; and xi. All associated site development and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement have been prepared in relation to the proposed development and accompanies this planning application
Retention of the existing electricity substation and associated facilities at Curraglass, and permission for the construction of an extension to the existing electricity substation, comprising up to 4 no. battery storage units, palisade fencing, bunded concrete plinths, associated electrical equipment, transformers and all ancillary site works
Permission for Retention for the following works:- A) Dwelling house as previously granted under planning Ref. No. 05/8194. B) Construction of a domestic workshop. C) Construction of kid's playhouse. D) Construction of a domestic storage shed. E) Construction of a timber storage shed. F) Construction of a garden tool shed. G) Construction of a hen's shed. H) Erection of a polytunnel. I) For reconfiguration of existing entrance and site boundaries as previously granted under planning ref. 05/8194, and for all associated site works. J) Permission also sought for upgrade of existing septic tank system with new on-site wastewater treatment system
Construction of dwelling house, and dometic garage and all associated site works
Construction of dwelling house and all associated site works
The brief summarizes the pattern across all 22 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/6398The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief