Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 533 decisions within 5 km, 3 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL INCLUDE THE FOLLOWING: (1) WEST STAND WHICH WILL CONSIST OF THE EXISTING PRECAST CONCRETE TERRACE, PROVIDING SEATING FOR APPROXIMATELY 2,100 SPECTATORS, ALONG WITH AN ANCILLARY ACCOMMODATION BUILDING WHICH WILL INCLUDE CHANGING FACILITIES, PUBLIC AND STAFF TOILETS, A GYMNASIUM, TREATMENT ROOMS, OFFICES, STORAGE, AND PLANT AT GROUND FLOOR LEVEL (PARTIALLY UNDER THE RAKED TERRACES) WITH MULTIPURPOSE ROOMS, LICENSED CORPORATE BOXES SUITES, MEETING SPACES, TRAINING ROOMS, CLUB ROOMS, A CONTROL ROOM, MEDIA ROOMS, AND OFFICES AT FIRST AND SECOND FLOOR LEVELS ABOVE. THIS WILL INVOLVE THE RENOVATION AND PART DEMOLITION OF THE EXISTING PARTIALLY COMPLETED ANCILLARY ACCOMMODATION BLOCK, (2) EAST STAND FEATURING A NEWLY CONSTRUCTED SPECTATOR TERRACE WITH SEATING FOR APPROXIMATELY 1,230 SPECTATORS, ALONG WITH A NEW AMENITY BUILDING WHICH WILL HOUSE A GYMNASIUM, TREATMENT ROOM, TOILETS, CHANGING FACILITIES, AND AN OFFICE AT GROUND FLOOR LEVEL WITH THE PROVISION OF A HOSPITALITY AREA TO FIRST FLOOR LEVEL AND A TV GANTRY LOCATED AT ROOF LEVEL AS WELL AS 2 NO. DETACHED, EXTERNALLY ACCESSED PUBLIC TOILET BLOCKS, (3) NORTH AND SOUTH STANDS WHICH WILL INCLUDE NEWLY CONSTRUCTED SPECTATOR TERRACES, EACH WITH SEATING FOR APPROXIMATELY 240 SPECTATORS AND ADDITIONAL STANDING CAPACITY FOR CIRCA 885 SPECTATORS EACH, (4) COMPLETION OF THE GRASS PLAYING PITCH FORMATION WITH STORM DRAINAGE AND GOALS, FLAGS, LINING FENCING RAILS AND NORMAL SOCCER ACCESSORIES AND (5) SITE DEVELOPMENT WORKS WHICH WILL INCLUDE THE PROVISION OF CAR PARKING, BUS PARKING, SEGREGATED PEDESTRIAN ROUTES, TURNSTILES, 4 NO. 1200 LUX FLOODLIGHTS (APPROXIMATELY 40 METERS TALL), AN ESB SUBSTATION, AND ASSOCIATED SITE WORKS, INCLUDING COMPLETION OF DRAINAGE, BOTH HARD AND SOFT LANDSCAPING, GATES, ACCESS CONTROL AND SITE BOUNDARY FENCING
ERECTION OF CIRCA 6600 CAPACITY SEATED STADIUM COMPRISING 4 STANDS & INCORPORATING CHANGING FACILITIES, OFFICE SPACE, CLUB GYM, TV GANTRY, STORAGE SPACE, TOILETS & 3 STOREY ADMIN. BUILDING (INCLUDING OFFICES, MEETING ROOMS AND CLUB ROOM) TOGETHER WITH ANCILLARY FACILITIES INCLUDING FLOOD LIGHTS, TURNSTILE & PARKING WITH ASSOCIATED SITE WORKS AND DRAINAGE
CONSTRUCTION OF A DRY BEDDED SHED FOR LIVESTOCK AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION TO EXISTING CRECHE TO PROVIDE AN ADDITIONAL FIRE ESCAPE STAIRWAY AND ALL OTHER ASSOCIATED SITE WORKS
(1) CHANGE THE USE OF A STORAGE BUILDING INTO AN AFTERSCHOOL ROOM, (2) EXTENSION OF THE CURRENT STORAGE BUILDING, TO INCLUDE AN ADDITION OF A LAUNDRY AREA AND A STORAGE CONTAINER, AND ALL RELATED SITE WORKS
A STORAGE BUILDING FOR SPORTS AND ATHLETICS EQUIPMENT AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO THE REAR (WESTERN) SIDE OF EXISTING BUILDING. THE PROPOSED EXTENSION SHALL PROVIDE 4 NO. CHANGING ROOMS, 2 NO. OFFICALS CHANGING, A SPORTS EXHIBITION AREA, TOILET FACILITIES AND ASSOCIATED SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 533 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2462022The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief