Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 52 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) RELOCATION & AMENDMENT TYPE OF DOMESTIC GARAGE PREVIOUSLY GRANTED UNDER PLANNING REF: 08/20870 AND (2) CONNECTION INTO EXISTING ON-SITE SURFACE WATER DRAINAGE & ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT AND VEHICLES WITH ASSOCIATED SITEWORKS, INCLUDING SITE PARKING, VARIOUS DRAINAGE SYSTEMS, NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM AND ANCILLARY PERCOLATION AREA, RAINWATER HARVESTING TANK, FIREFIGHTING WATER RESERVOIR TANK, LANDSCAPING, BOUNDARY FENCE AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE AND ALL ANCILLARY WORKS
(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL POLISHING FILTER, (3) PROVISION OF ADDITIONAL CAR PARKING AREA AND (4) ALL ANCILLARY SITE DEVELOPMENT WORKS. A LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY IS REQUIRED FOR THIS ACTIVITY. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION
(1) THE REDUCE LEVEL DIG TO THE NORTH WESTERN BOUNDARY FOR ACCESS TO AN INCREASED BIO FILTER (ODOUR CONTROL SYSTEM) (2) CHANGE OF USE FROM EXISTING STORAGE SHED TO ENGINEERING WORKSHOP (3) EXTENSION OF THE MAIN STORAGE SHED TO PROVIDE ADDITIONAL WOODCHIP AND BIOMASS PROCESSING AREA (4) EXTENSION OF EXISTING REINFORCED BOUNDARY WALL (5) UNDERGROUND STORM WATER ATTENUATION & SETTLEMENT TANK AND TO INCLUDE ALL ASSOCIATED SITE WORKS
RETENTION OF (1) EXTENSION TO THE EXISTING OFFICE, LOCATED ALONG THE SOUTH EASTERN BOUNDARY, WHERE SAME EXTENSION IS IN THE FORM OF TWO PREFABRICATED UNITS (2) THREE PREFABRICATE UNITS FOR USE AS; CANTEEN, STAFF WELFARE AND OFFICE STORE, ALL OF WHICH ARE LOCATED TOWARDS THE SOUTH EASTERN CORNER OF THE SITE (3) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED AT SOUTH EASTERN CORNER OF THE SITE (4) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED APPROXIMATELY MID WAY ALONG THE SOUTH WESTERN BOUNDARY (5) PREFABRICATED SWITCHROOM / COMMS. UNIT, LOCATED TOWARDS THE NORTH EAST BOUNDARY, AT THE REAR OF THE MAIN STORAGE / PROCESSING SHED AND PERMISSION FOR (1) CONSTRUCTION OF A CONCRETE BUILD MV SUBSTATION BUILDING AND ASSOCIATED SWITCHROOM (2) ALL ANCILLARY SITE DEVELOPMENT WORKS
(1) 3 BAY EXTENSION TO THE SOUTH WEST SIDE OF THE EXISTING MAIN STORAGE / PROCESSING SHED (2) REVISED SITE BOUNDARY, TO INCLUDE AN EXTENSION TO THE EXISTING YARD TOWARD THE NORTH WEST OF THE SITE (3) UPGRADED REPLACEMENT OF THE EXISTING BIOFILTER, WHERE SAME STRUCTURE COMPRISES OF CONCRETE RETAINING WALLS, AN ASSOCIATED MONO-PITCH ROOFED SHED MEASURING 69.4M LONG AND ASSOCIATED INFRASTRUCTURE (4) ALL ANCILLARY SITE DEVELOPMENT WORKS
The brief summarizes the pattern across all 52 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051622The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief