Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 296 decisions within 5 km, 1 exact-site or onsite candidate record, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Section 42 - extension of appropriate period - 16/176 - 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 13.76 ha to include one single storey electrical substation building, electrical transformer / inverter station modules, solar PV panels ground mounted on steel support structures, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
Demolish a 29 sqm extension to the side of the existing dwelling along with a 56 sqm outbuilding and erect a 122m extension to the side of the existing 55 sqm original dwelling, block up the existing vehicular entrance and construct a new vehicular entrance with improved sightlines along with all associated site development works
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Agricultural slatted unit shed along with associated site development works
The brief summarizes the pattern across all 296 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2660The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief