Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 526 decisions within 5 km, 3 exact-site or onsite candidate records, and 23 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
23 structured nearby appeal records.
23 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of; (i) Construction of a new single storey Primary School (1,318m2), new internal road with set-down area and car parking, covered bicycle parking and entrance gate, new site boundaries, hard play area, landscaping and all associated site works on a site area of 1.94 acres, (ii) new site entrance from Bealach Bri, (iii) new bus set down, adjacent to new entrance, on Bealach Bri and associated road works at the junction of the proposed site entrance, (iv) Removal of 5no existing temporary prefabricated classrooms granted planning under 16/301 and RETENTION of pre-school modular cabin granted planning under 17/296
To Extend the Appropriate Period of Planning for P16/301 for the Installation of a 2 Classroom Portacabin with toilet facilities including connection to public services and to erect new perimeter fencing on 2 sides of same and for RETENTION permission for the installation of existing Resource Room Portacabin on site including ancillary site works
For the construction of a single storey extension to the existing dwelling, together with all associated ancillary and incidental site works
Of a shed, garage and extensions to the front and rear of the dwelling house (previously granted planning under P8-18144)
For the development which will consist of a 2 storey Community Care Centre, new vehicular entrance, ESB substation, roof mounted PV panels, associated signage (and potentially illuminated signage) and all associated siteworks
For development which will consist of the demolition of the flat roofed annex and the addition of extensions to south-east and north-east, a new external porch to front of dwelling, and demolition of the two gate pillars to either side of driveway entrance, along with associated site works above and below ground
The brief summarizes the pattern across all 526 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21576The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief