Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 131 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Of PL 17/261 for the proposed construction of Single & Two-Storey extensions to rear of existing dwelling and all ancillary site works
For proposed new storey and a half type dwelling, detached domestic store, formation of new entrance, connection to main foul sewer and all ancillary site works, changes to site boundaries and relocation of dwelling on site, amendments to elevations, relocation of domestic store, access and driveway and all ancillary site works
The proposed construction of a bungalow-type dwelling house, site entrance, boundary fence, connections to existing public services & all ancillary works
For the proposed construction of a dormer bungalow type dwelling house, entrance, boundary fence/wall, connection to existing public foul sewerage mains and all ancillary site works
Of PL19/179: to complete a housing development as granted under PL04/1298 which comprised of the construction of 26 No. detached 2 storey dwelling houses, (with omission of 1 number two storey dwelling house), formation of access road and access onto public road, connection to adjoining utility services, site drainage, proposed foul effluent pumping station and rising main, landscaping, boundary walls and fences, cutting and filling works and ancillary works. The proposed works of which permission is now being sought consist of permission to finish all external works, utilities and services as granted under PL04/1298 and permission to construct 6 no. two storey dwellings which are currently at structural slab level and permission to construct 5 no. two storey dwellings of which have not been started and ancillary works
To complete a housing development as granted under PL04/1298 which comprised of the construction of 26 No. detached 2 storey dwelling houses, (with omission of 1 number two storey dwelling house), formation of access road and access onto public road, connection to adjoining utility services, site drainage, proposed foul effluent pumping station and rising main, landscaping, boundary walls and fences, cutting and filling works and ancillary works. The proposed works of which permission is now being sought consist of permission to finish all external works, utilities and services as granted under PL04/1298 and permission to construct 6 no. two storey dwellings which are currently at structural slab level and permission to construct 5 no. two storey dwellings of which have not been started and ancillary works
The brief summarizes the pattern across all 131 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 224The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief