Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,213 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a below ground foul pumping station incorporating a below ground emergency storage tank, a below ground storm water pumping station, a 3.1m high control building and ESB substation, a 2.65m high chemical dosing unit, provision of a 2.15m high standby generator with acoustic barrier, a 1.5m high air handling unit with acoustic barrier, a 4m high mobile lifting gantry and a 2.4m high security fence along with indigenous plant screening. Pipework associated with the development includes a foul rising main along the R613, local roads and green fields from the foul pumping station to the Shanbally WWTP (c. 3km) as well as 3 no. short sections of pipeline (c. 136.5m in total) associated with the storm water pumping station and foul pumping station. Installation of 2 no. new reinforced concrete manhole chambers on existing pipelines will also be required. The development will also consist of all associated site work and site excavation works both above and below ground for the pumping stations, pipelines. The works will include the demolition of a derelict bungalow at proposed pumping stations site.
The installation of a solar photovoltaic (PV) Array (Proposed Area = 1132m2) on the roof of an existing single storey warehouse building with new external vertical access ladder to south elevation at the existing facility and associated site works on an Integrated Pollution Control (IPC Reg. No. P0476) licensed site for Recordati Ireland Ltd.
An amendment to existing practices to use solvents and solid materials generated by manufacturing processes at other EPA licenced industrial facilities in Ireland as a supplementary fuel and feedstock in the existing waste treatment and recovery infrastructure at the site. The proposed development does not involve fundamental change from the present day on-site operations and will provide a beneficial alternative to the use of fossil fuel on the site. There will be no construction works associated with the proposed development. There will be no intensification of past use, no new emission points and no exceedance of the capacity thresholds and limits set in the existing Industrial Emissions licence. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0006-03. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Permission for retention for the existing single storey kitchen extension (17m2) located at the rear elevation (north) of existing dwelling house.
Permission for modifications to our existing dwelling house, namely: i) construction of a single storey extension to the side (east) elevation, ii) construction of a single storey extension to the rear (north) elevation, iii) insert 2 no. velux roof lights on the existing front roof, iv) revisions to some of the existing opes - their size and locations on the front and rear elevation of existing dwelling, so as to suit new internal room layouts, v) removal of both chimney stacks and vi) insert a canopy roof overhang on front (south) elevation over new external front slider door ope.
Permission for the installation of solar carports and ground mounted solar PV arrays. The proposed development will consist of single and double row mono-pitch solar carports over existing surface car park areas, solar panels on ground mounted frames, 1 no. single storey low voltage/medium voltage transformer unit, 2 no. spare parts containers, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for car port areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via an existing entrance from the R613. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies
The brief summarizes the pattern across all 1,213 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/6038The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief