8% of nearby decided applications were refused. The site check found 869 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a building (6625 sq.m) containing a waste transfer and recycling facility. The proposed development also includes the construction of a separate two storey Administration Block (178sq.m), ESB Sub-Station (36 sq.m), 3 no. weighbridges, 2 no. access ramps, new exist gate and signage to eastern site boundary, new boundary treatments, supplementary planting inside western site boundary, underground firewater containment tank, underground diesel storage tank, service yard, 23 no. car parking spaces, new drainage works including 3 no. oil interceptors and 4 no. silt traps along with all associated site works all on a site measuring 1.49ha. The proposed development will require a Waste Licence and an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Retention planning permission for the change of levels at the site, Permission for the construction of 1 No. Warehouse building with ancillary offices, staff facilities and meeting rooms with a total floor area of 9,967m2, along with a car park area, hardstanding areas, entrance off existing estate road, site levelling and contouring works and all associated site development works on a site of 2.44 hectares.
Erection of signage on existing enterprise unit
Permission for a block bunker to enclose an existing generator and the retention of the part of bunker already built.
Construction of additional internal office and ancillary accommodation floor area at the first floor and also alterations to the existing layout at ground floor level all of which areas shall be ancillary to the existing warehouse use, alterations to elevations, 2 new canopies over the dispatch and loading areas on the north east elevation and the south east elevation, new signage, additional car parking and additional van and truck parking and associated site works all to an existing warehouse.
Retention of (1) palisade fencing including vehicular gates and personnel gate, (2) demolition of existing concrete plinths (3) raising of levels locally on site, and all associated site works
The brief summarizes the pattern across all 869 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18/7200The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief