Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 330 decisions within 5 km, 7 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an extension to the existing timber frame building manufacturing facility, for the purpose of timber frame building manufacturing and storage
Permission for the installation of rooftop photovoltaic solar panel arrays consisting of approximately 1,000 square metres of solar panels on the eastern roof slopes, and approximately 1,000 square metres of solar panels on the western roof slopes of the existing manufacturing building, and all ancillary services and associated site works.
Permission for the construction of an extension of area approx. 5,122 sq.metres to the existing manufacturing building, and the construction of a canopy of area approx. 1,188 sq.metres over vehicle parking area at east side of proposed extension, and vehicular parking, and all ancillary services and associated site works to the existing timber frame building manufacturing facility.
Permission for the development of the proposed construction of a new sprinkler tank, demolition of existing sprinkler tank and all associated site works.
The development will consist of the proposed warehouse distribution unit incorporating office accommodation, 2 no. new site entrance access points all off exiting internal estates road, site levelling and contouring, 1 no. security kiosk, associated site signage (1 no. 1.8m high totem sign and 3 no. curved entrance signs), 1 no. waste compactor, truck loading, hard standing and truck parking bay areas, 52 no. parking spaces (to include 47 no. regular spaces, 2 no. disabled spaces and 3 no. electric charging point spaces), 1 no. bicycle shelter, and all other ancillary and associated site development works including landscaping.
The relocation of 100 staff car parking spaces in 2 new car-parking zones (Zone A = 54 spaces and Zone B = 46 spaces) and all other ancillary and associated site development works.
The brief summarizes the pattern across all 330 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4963The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief