Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 678 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an extension to the existing manufacturing facility and all ancillary site works. The proposed development consists of a building ranging in height from 2 to 3 storeys and comprising a new production floor over two levels, administrative offices, canteen, labs, staff wellness centre and locker rooms and makes provision for roof top plant. Ancillary structures and site works including a gas compound, waste compound, powder store, multi store shelter, sprinkler tank, alterations to road layout within the site and staff car parking. Access to the site will be from the existing entrances to the IDA Business Park. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Revisions to a previously permitted development (Planning Reg. No. 19/5836) comprising the revised routing of approx. 78m of a permitted dedicated shared use cycleway and footpath. The revised routing incorporates a revised crossing point by the shared cycleway/footpath of an internal Business Park road. The development also incorporates ancillary revisions to existing safety barrier provision. All on a site area of 1,271sqm approx.
Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases.
Permission for construction of 3No. general industry units; The provision of an ESB sub-station, 3No. bicycle shelters, associated site signage (1 main entrance sign & 3No. totem signs), 3 no. waste storage areas, truck hardstanding, HGV parking areas, car-parking and all other ancillary and associated site development works including landscaping; all at Anngrove Carrigtwohill, Co. Cork.
The demolition of an existing dwelling house and associated outbuilding, and the construction of a residential development of 42 no. residential units and all ancillary site works. The proposed development consists of the construction of 4 no. 4 bedroom detached dwellings, 4 no. 4 bedroom semi-detached dwellings, 10 no. 3 bedroom semi-detached dwelling houses, 2 no. 3 bedroom townhouses and 2 no. 2 bedroom townhouses. The proposed development includes the construction of 5 no. three storey apartment buildings containing 10 no. 2 bedroom and 10 no. 1 bedroom apartment/duplex units. Ancillary site works include the provision of bicycle stores, bin store and pumping station. Vehicular access to the proposed development will be provided via a new entrance from the L-3616 with a separate pedestrian access also provided from the L-3616.
Construction of a new detached 2 storey dwelling, a new vehicular entrance, mains connection and all associated site works.
The brief summarizes the pattern across all 678 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/5877The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief