Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 706 decisions within 5 km, 14 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) To relocate the existing single storey gas bottle store (2) To relocate the existing single storey waste compactor enclosure and (3) All associated site development works.
(1) To construct a new single storey extension of total area 750sqm to the western side of the existing main building containing a new high-speed Filling Line to replace the existing filling line on the current site for final product filling, (2) modifications to existing car parking area to suit proposed extension. (3) all associated site development works.
Alterations to the extension and expansion of their existing facility permitted by Cork County Council planning references 23/5968 and 23/6412 and all ancillary site development works. The proposed development includes alterations to planning reference 23/5968 comprising the omission of a permitted detention basin and replacement with Stormcell attenuation system. The proposed development also includes alterations to planning reference 23/6412 comprising: (i) The construction of a revised extension to the existing GE Healthcare building comprising a filling line, solution preparation and utilities building with an approximate maximum height of 13 metres (reduction from approximate maximum height of 27 metres). (ii) The reduction in area and reconfiguration of the permitted utilities yard/contractors compound to include a utilities building, electrical building, pump house, waste compactor building, nitrogen tank, mains water tank, piperacks to the proposed new filling line and solution preparation building and all ancillary plant and service infrastructure. The works provide for the maintenance of the existing project cabin and workshop buildings on site, with partial demolition of the workshop building. (iii) The relocation west of the existing vehicular site entrance from the north and associated realignment of the internal service road within the site. (iv) All other ancillary site development and enabling works which include rooftop PV panels, signage, revised servicing and drainage proposals, landscaping works and establishment of a temporary construction compound (area to be reinstated post construction phase) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Permission for the extension and expansion of their existing facility and all ancillary site development works. The proposed development provides for the construction of a new extension to the existing GE Healthcare building (approximate maximum height of 27 metres) comprising a new filling line, solution preparation and utilities building. The proposed development also includes: i) The demolition of an existing single storey entrance security building, upgrade and reconfiguration of existing site entrance to the north, construction of a new relocated single storey entrance security building, ii) The demolition of existing waste bins structure, gas storage building, and an existing contractors compound, inclusive of workshop, prefabs and other ancillary structures, iii) The establishment of a utilities yard to include a pump house, chemical store, waste storage building, fuel tank, fire water retention tanks, gas storage, liquid nitrogen tank (LN2), mains water tank (MW Tank), rainwater harvesting treatment hut (RWH Tank) rainwater harvesting tank (RWH Tank), pipe racks to the proposed new filling line, solution preparation and utilities building and all ancillary plant and services infrastructure, iv) All other ancillary site development works which includes signage, tree removal and compensatory planting, bicycle shelter, provision of a new gated pedestrian/cycle entrance to the south onto Cork Road (L-3678) and rooftop PV solar panels, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
The development consists of site enabling works to facilitate future expansion of their facility and all ancillary site development works. The proposed development comprises modifications to the internal site layout including: (i) The decommissioning of existing surface car parking spaces to the northwest of the site and their relocation to the south and east of the site. Decommissioned car parking areas to be finished with temporary graded gravel. (ii) All ancillary site development works including the relocation of existing smoking and bicycle parking shelters, removal of existing container structure, tree removal, compensatory planting, site drainage and landscaping works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
To apply for a temporary permission for the provision of single storey pre-fabricated office and general lab building. The development also includes the provision of a temporary covered walkway connecting the proposed temporary office accommodation to the existing innovation centre, car parking, cycle parking and all ancillary site development works. Access to the proposed development will be from the existing entrance to the IDA Business park.
The brief summarizes the pattern across all 706 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/6192The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.