Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 756 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of warehouse extension to the rear of existing warehouse premises unit 8A, and elevational changes to the front and rear of existing warehouse premises unit 8.
Permission for (1) construction of an expansion to the existing production and warehouse building to provide an additional 12,207 sqm floor space over 4 no. levels to a maximum height of 28.21 m. (2) Construction of 2 no. new dock levellersstations together with adjustments to internal roads. (3) Provision of new site vehicle entrance from the L7088-2 public road. (4) Construction of 3 no. areas of permanent contractor’s compound at the south west yard to accommodate; up to 16 no. 20ft cabins (aggregate floor area 283sqm and max height 2.7m); 15 no. 40ft workshop cabins (aggregate floor area 531 sqm and max. height of 2.7m); temporary provision of 2 no. contractors welfare facilities (aggregate floor area 34.1 sqm and max. height of 2.7m) and a contractor's communications room (floor area of 17.7m2 and max. height of 2.7m). (5) Construction of a communications building (floor area 22.8m2 and max height of 3.42m). (6) Provision of a temporary construction compound to accommodate a modular porta-cabin offices (floor area of 40.1sqm and max. height of 2.7m and a laydown area. (7) Relocation of 54 no. car parking spaces and hard standing HGV trailer park to south west yard from the existing food flavours building to include a communications building (floor area 22.8m2 and max. height of 3.42m). (8) Construction of new surface water attenuation tank and fire water attenuation tank with associated drainage connections under the L7088-0 local public road. (9) Upgrade and repositioning of the existing south west yard vehicle entrance to the L7088-0 public road and provision of new pedestrian road crossing on the L7088-0 public road with upgrades to the public footpath. (10) Provision of site fencing to include internal 2.4m louvered screen wall at the southwest yard (11) all associated site development works, internal access roads, landscaping and underground services provisions. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Permission for the construction of an extension to existing dwelling house, alterations to existing elevations and all associated works
Construction of an expansion to the existing production building to provide an additional 3,252sqm floor space, over 4 no. operational levels to maximum height of 28.1 meters. To include ancillary and associated works comprising: (i) construction of approximately 200 sqm of new concrete pavement at the south west corner of the proposed building and regarding of approximately 120sqm of existing concrete paving at existing site entrance on the north east corner of the proposed building. (ii) decommissioning and demolition of an existing underground surface water attenuation tank adjacent to the existing food flavours building which requires the temporary removal and later reinstatement of car parking space adjacent to the tank. (iii) all associated site development works, landscaping and underground services provisions with an overall site area of 1.07 ha, including the provision of underground pipe connections to an existing underground tank for surface water management.
The erection and installation of solar photovoltaic panels on to the roof of the main PepsiCo building and all associated site works
Works to industrial warehouse development (Previous Pl.Reg.No. 03/1563): 1) amalgamation of two approved warehouse units, 2) construction of loading bay extension, 3) construction of glazed porch extension, 4) elevational changes including changes to external door/fenestration layout and addition of additional windows to cater for enlarged internal office space, 5) installation of on-site septic tank system and, 6) changes to site boundaries.
The brief summarizes the pattern across all 756 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/5286The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief