Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 742 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a new two storey filling hall extension and all associated site works at the plant.
The construction of extensions to the R&D Facilities including a two story office and circulation space with entrance canopy extension to the front (South) of the building, a new entrance, stairwell and meeting room at the East side of the building, new first floor toilets and a new utility building to the North side of the building, a new stairwell to the West of the building, new palisade fencing along South and East of the site and all associated site works at the plant.
(1) the demolition of the existing Emerald and Inis Buildings and canopy walkway to the rear O’Neill’s Building (2) the construction of a two storey Research & Development Facility that includes laboratories, offices, training/meeting rooms, kitchen, canteen area, WCs, open courtyard, open plant area to the rear at first floor level, storage areas, link at ground and first floor level to the existing Research & Development Facility. (3) The construction of a new 2.5m wide footpath and cedar clad boundary fence to the south and east of the building to match exiting with sliding gates & pedestrian/turnstiles and the replacement of the existing chain link fence with new chain link fence to the northern boundary. (4) The construction of a new service yard & associated vehicular entrance to the east of the building, waste compound & gas botte storage area (5) The installation of roof top mounted plant, flues and 60m2 of photovoltaic solar panels (6) The installation of a bicycle stand, two new road-crossings and a revised parking layout to the east of O’Neill Building and all associated site works. (7) and are also applying for permission for retention of existing roadside lay-by. All at their plant at Little Island Business Park.
Erection of an ESB Sub-Station and switch room with associated site works.
Demolition of the existing Reagecon building including crushing concrete on site and all ancillary site works
Construct extensions to the front and rear of existing commercial premises and Permission for Retention of first floor mezzanine area.
The brief summarizes the pattern across all 742 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/6971The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief