Executive snapshot
8% of nearby decided applications were refused. The site check found 483 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to carry out the following works to upgrade their existing waste water treatment plant which serves their milk processing plant, -, (i) demolish the two existing concrete circular ADF filter tanks and replace with a new rectangular concrete tank, for new biological treatment technology, (ii) new ESB substation and switchroom and equipment plinth; (iii) decommission and remove the two existing metal clad biotowers and (iv) associated site works. This application relates to an establishment which has an Industrial Emissions Licence (PO403-03).
Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.
Permission for the construction of an ancillary bulk storage building and all associated site development works (change of elevational treatment of the southern and western elevations of the ancillary bulk storage building previously permitted under application register reference 20/4925) on a site to the south of, and attached to, the Co-Op store at West End and Park Road, Annabella, Mallow, Co. Cork.
Permission for retention of detached domestic shed as constructed for use as domestic store and utility room and retention of shed as constructed for use as garden utensil store.
Alterations to Co-op store and café permitted, not yet constructed, under application register reference 20/4925, which will comprise: 1) the construction of a first floor internal mezzanine to the Co-op store to accommodate a staff area (offices, staff canteen and welfare facilities); 2) the construction of a first floor bulk store mezzanine to accommodate an additional bulk storage area; 3) all ancillary works including internal stairs and a lift; and 4) the construction of a ground floor extension to the café and associated extended external canopy
Permission for Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Extension of Duration to Permission granted under Planning Ref. No. 20/4925
The brief summarizes the pattern across all 483 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20/7001The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief