Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 137 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a detached dwelling, detached garage, new potable well, an effluent treatment system, new vehicular entrance and all associated site works.
Permission to construct a new dwelling house.
Construction of new domestic entrance to existing dwellinghouse.
Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works.
An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork
Permission for: (1) Construction of an agricultural entrance onto the R618. (2) All associated site works.
The brief summarizes the pattern across all 137 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/4782The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief