Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

'Monterey' Bearforest Lower Mallow Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

'Monterey' Bearforest Lower Mallow Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 459 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
21/5905
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

459Nearby applications
2Site-linked candidates
8%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

21/5905

Permission for retention for the as built dwelling house and attached garage.

Granted0.0 km28 September 2021
21/4648

The construction of 9no. two storey dwelling houses and all ancillary site works. The proposed development consists of the construction of 4no. 5 bedroom semi-detached dwelling houses, 2no. 4 bedroom semi-detached dwelling houses, 2no. 4 bedroom detached dwelling houses and 1no. 5 bedroom detached dwelling house. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Granted0.2 km11 April 2022
21/4876

To install a new packaged wastewater treatment system and polishing filter to service existing dwelling, to decommission existing septic tank, permission for revised site boundaries and all associated site works to existing dwelling.

Granted0.2 km27 October 2021
23/6565

Permission for development which consists of a new water main pumping station. The development will consist of the erection of a new kiosk and the installation within such kiosk of 2 no. water pump sets and surge vessels for Killavullen and Rahan areas water supply from Mallow, and associated pipework within kiosk. Installation of new 6m high radio pole for new pumps communications associated ESB mini-pillar

Granted0.3 km25 April 2024
21/5581

Alterations and extension to the existing St Mary’s Daycare Centre, Mallow consisting of the following: (1) For internal alterations to the layout and external alterations to the existing elevations, (2) To construct a new single storey extension to the rear of existing building to accommodate a new staff area comprising of 2 no. offices, canteen, and toilet, (3) To construct a new front entrance porch to the side of existing building (4) For new external works consisting of a new sit out garden area with retractable awning overhead, new car parking area, bin storage area, signage and all associated site works and services in accordance with plans and documents submitted.

Granted0.3 km20 September 2021
19/5078

The alteration of Mallow Sewerage Scheme to remove combined sewer overflows from the network. The proposed scheme will include: 1. The alteration of Mallow Wastewater Treatment Plant to provide for wastewater treatment capacity for 22,000pe (increased from 18,000pe) at Ballyellis, Mallow. The WWTP upgrade will comprise construction of new local pumping station, refurbishment/replacement of inlet works, distribution chambers, alteration of existing tanks, construction of plinths and kiosks, sludge import acceptance unit, sludge tanks, chemical storage tanks, associated pumps, replacement of sludge presses in existing sludge building with centrifuges, all with associated odour control facilities, electrical control panels and kiosks, standby power generation equipment and diesel tank, extensions to existing access roads and all associated site development and site excavation works above and below ground. 2. Construction of a new pump station at Bearforest Lower, Mallow, to transfer flows from the network to the WWTP at Ballyellis. The development will contain a foul sump, storm sump, valve chamber, lifting gantries, access stairs, control house with MV Substation, storm tank, interconnecting pipework and chambers, overflow pipework and chambers from storm tank to river Blackwater, twin rising mains to WWTP at Ballyellis, flow meter chambers, odour control equipment, 2.4m high boundary fence, access gate, access roads, hardstanding areas, landscaping and all associated site development and site excavation works above and below ground. Existing pump station to be decommissioned and above ground structure demolished on completion. 3. Upgrade of sections of the sewer network in Mallow comprising construction of pipelines and chambers in fields, public open spaces, roads and footpaths in the townlands of Ballyellis, Bearforest Lower, Ballydahin, Carhookeal, Quartertown Lower, Castlelands, Mallow, Annabella, Lackanalooha, Kilknockan and Spa Glen. Pipelines will include a crossing of the river Blackwater between Castlelands and Bearforest Lower east of Mallow Bridge. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.

Granted0.3 km04 December 2019

The brief summarizes the pattern across all 459 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required