Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 351 decisions within 5 km, 6 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Permission for construction of detached single storey building to rear of existing dwelling house, comprising of home office, ancillary in use to existing dwelling house, and all associated site works
To construct two storey dwelling, domestic garage, site entrance, sewerage treatment system and all associated site works
Retention of first floor dormer windows as constructed to front and rear of one and a half storey dwelling, permitted under planning ref 19/04448 but with a change to roof profile and all associated works.
The construction of a dwelling house, modified entrance and all ancillary site works including the installation of a treatment unit and polishing filter
Dwelling, waste water treatment plant, a new site entrance and associated site ancillary works
Permission for retention of driveway and site entrance as constructed, representing modifications to the driveway and entrance permitted under application Reg. Ref. 18/5225. Permission for construction of stone filled gabions to support sloped ground from the driveway edge to site boundary, a timber post and rail site boundary fence, 1,000mm high and timber sheeted gates fixed to rendered concrete block piers, 450mm x 450mm in width and 1,000mm high. The proposed development will include all associated ancillary site development works. We note that this development is also subject to an enquiry by Cork County Council's Planning Enforcement Section (Ref: EF/24/04).
The brief summarizes the pattern across all 351 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22/4989The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief