Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 903 decisions within 5 km, 4 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Erection of signage on existing enterprise unit
Permission for a block bunker to enclose an existing generator and the retention of the part of bunker already built.
Retention planning permission for the change of levels at the site, Permission for the construction of 1 No. Warehouse building with ancillary offices, staff facilities and meeting rooms with a total floor area of 9,967m2, along with a car park area, hardstanding areas, entrance off existing estate road, site levelling and contouring works and all associated site development works on a site of 2.44 hectares.
Warehouse building with total floor area of 6,015.2sq.m, car parking and yards, new entrances off the existing Estates Road, site levelling/contouring and all associated site works on site of 1.6525 hectares.
The construction of 2 no. Strategic Logistical, storage and distribution warehouse units, incorporating office accommodation, 2 no. bicycle shelters, associated site signage (4 no. 1.8m high totem signs), adjusted site entrance access off existing Estates Road, site levelling and contouring, 2no. waste compactors, truck loading, hardstanding and truck parking bay areas, 66 no. car parking spaces of which include, 4 no. disabled spaces, and 4 no. electric charging spaces, and all other ancillary and associated site development works including landscaping. A Natura Impact Statement will be submitted to the planning authority with the application.
Construct a building (6625 sq.m) containing a waste transfer and recycling facility. The proposed development also includes the construction of a separate two storey Administration Block (178sq.m), ESB Sub-Station (36 sq.m), 3 no. weighbridges, 2 no. access ramps, new exist gate and signage to eastern site boundary, new boundary treatments, supplementary planting inside western site boundary, underground firewater containment tank, underground diesel storage tank, service yard, 23 no. car parking spaces, new drainage works including 3 no. oil interceptors and 4 no. silt traps along with all associated site works all on a site measuring 1.49ha. The proposed development will require a Waste Licence and an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
The brief summarizes the pattern across all 903 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/5482The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief