Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Ballydaheen Road/ Mill Street Ballydahin Mallow Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Ballydaheen Road/ Mill Street Ballydahin Mallow Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 472 decisions within 5 km, 14 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
22/6225
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

14 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

472Nearby applications
14Site-linked candidates
8%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

22/6225

The construction of 52 no. residential units comprising of 12 no. 3 bed units, 18 no. 2 bed units and 22 no. 1 bed units [a mix of 3 bed townhouses, 1 & 2 bed maisonettes and 1, 2 & 3 bed own-door apartments]. The units range in height from 2 to 3 storeys. Permission is also sought for the construction of 3 no. commercial units [Beauty Salon/Coffee Shop/Café and Newsagents] as well as a multi-purpose/ community space at ground floor level. The development also includes landscaping, drainage, boundary treatments, 96 no. bicycle parking spaces, 57 no. car parking spaces, bin storage, play area, planting/screening and all associated site development works at Ballydaheen Road/ Mill Street, Ballydahin, Mallow, Co. Cork. A Natura impact statement will be submitted to the planning authority with this application. The Natura impact statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.

Granted0.0 km25 October 2023
24/6046

Permission for change of use / conversion of existing two storey dwelling to 2 no. apartments, consisting of a 2 bedroom apartment on the ground floor and a 2 bedroom apartment on the first floor, as well as carrying out associated changes to the building elevations.

Granted0.1 km18 December 2024
18/6625

Retention of the two storey extension constructed to the rear of the dwelling.

Granted0.2 km22 November 2018
19/5078

The alteration of Mallow Sewerage Scheme to remove combined sewer overflows from the network. The proposed scheme will include: 1. The alteration of Mallow Wastewater Treatment Plant to provide for wastewater treatment capacity for 22,000pe (increased from 18,000pe) at Ballyellis, Mallow. The WWTP upgrade will comprise construction of new local pumping station, refurbishment/replacement of inlet works, distribution chambers, alteration of existing tanks, construction of plinths and kiosks, sludge import acceptance unit, sludge tanks, chemical storage tanks, associated pumps, replacement of sludge presses in existing sludge building with centrifuges, all with associated odour control facilities, electrical control panels and kiosks, standby power generation equipment and diesel tank, extensions to existing access roads and all associated site development and site excavation works above and below ground. 2. Construction of a new pump station at Bearforest Lower, Mallow, to transfer flows from the network to the WWTP at Ballyellis. The development will contain a foul sump, storm sump, valve chamber, lifting gantries, access stairs, control house with MV Substation, storm tank, interconnecting pipework and chambers, overflow pipework and chambers from storm tank to river Blackwater, twin rising mains to WWTP at Ballyellis, flow meter chambers, odour control equipment, 2.4m high boundary fence, access gate, access roads, hardstanding areas, landscaping and all associated site development and site excavation works above and below ground. Existing pump station to be decommissioned and above ground structure demolished on completion. 3. Upgrade of sections of the sewer network in Mallow comprising construction of pipelines and chambers in fields, public open spaces, roads and footpaths in the townlands of Ballyellis, Bearforest Lower, Ballydahin, Carhookeal, Quartertown Lower, Castlelands, Mallow, Annabella, Lackanalooha, Kilknockan and Spa Glen. Pipelines will include a crossing of the river Blackwater between Castlelands and Bearforest Lower east of Mallow Bridge. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.

Granted0.2 km04 December 2019
25/6157

Permission for the development will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: 1) installation of 8 no. electric vehicle charging bays with 8 no. Tesla illuminated charging units and associated signage, 2) installation of proposed Tesla supercharger power cabinet equipment, 3) installation of proposed modular substation, 4) erection of associated EV signage, 5) all associated site development works including lighting & line marking.

Granted0.2 km02 March 2026
22/6384

Retention of single storey pavilion structure (floor area 203sq.m) which is located in the existing carpark at the rear of the Arches Bar & Restaurant premises. The use of the pavilion structure as an events venue is ancillary to the existing bar & restaurant use on the site. Temporary permission is being sought for a period of 5 years for the pavilion structure.

Refused0.2 km13 December 2022

The brief summarizes the pattern across all 472 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required