Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 144 decisions within 5 km, 3 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works.
An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.Cork
1) Cead Pleanala a fhail le foirgneamh storala breise le framai cruach iarainn a thogail mar mheadu achair ar an bhFoirgneamh Storala ata togtha cheana fein (faoi Cead Pleanala 18/06386), chomaith le oibrithe coimdeach laithreain ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Follain Teo. 2) Cead Pleanala a fhail le paneil fotavoltach greine a chur ar dhionta an priomh Monarcha Phroiseas Bidh agus an Foirgneamh Storala. [1) Permission for construction of an additional steel framed storage building, thus extending the area of the existing storage building (granted under Planning Ref: No: 18/6386) as well as associated site works on the site close to the new Follain Teo food processing factory. 2) Permission to install a photovoltaic solar panel on the roof of the main food processing factory and the storage building].
Le framai cruach iarainn a thogail in aired ar an mba ualaigh ata suite laistiar den Monarcha Phroiseas Bidh le Follain Teo. (faoi Cead Pleanala 13/04748), chomaith le oibrithe coimhdeach laithreain. - To construct a steel framed enclosure over the existing loading bay area to the existing Folláin Teo food process facility (under Planning Permission 13/04748) inclusive of all ancillary site works.
Foirgneamh nua storala a thogail chomaith le oibrithe coimhdeach laithreain, ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Folláin Teo. (New storage building with associated site works at site adjacent to the new Folláin Teo Food Processing Factory).
Séard a bheaidh sa bhforbairt seo ná cead pleanála a fháil le haghhaidh a) Cuir isteach cosán nua mórthimpeall ar an áit, falú nua agus tuilsoilsiú nua mórthimpeall ar an bpáirc, b) Cuir isteach tuilsoilsiú nua mórthimpeall ar an bpáirc traenála, c) cuir isteach grianphainéal ar an díon aran bhfiorgneamh atá ann. d) Athdhromchlú ar an gcár clós atá ann, e) Cuir isteach soilsiú poiblí mórthimpeall ar an bpáirc agus na suíomhanna coimhdeach ag Pairc Iosagáin, Magh Reidh, Baile Mhic Íre, Maigh Chromtha, Co. Chorcaí / Naomh Abán CLG are applying for Permission for; a) a new footpath around the site, new fencing and floodlighting around the pitch, b) Installation of new floodlighting around the training pitch, c) Installation of solar panels on the roof of the existing building, d) Resurfacing of the existing carpark, e) Public Lighting around the pitch and associated areas at Páirc Íosagáin, Magh Reidh, Baile Mhic Íre
The brief summarizes the pattern across all 144 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22/6433The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief