Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 865 decisions within 5 km, 8 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development at the existing distribution centre (including ancillary internal offices), which consists of retention of (1) increased internal office floor area, (2) alterations to elevations of building to include windows at first floor of south elevation to facilitate increased ancillary internal offices.
Construction of the following (1) Two no. light industrial / warehouse units (Unit No. 5 and Unit No.6) with ancillary office space (Unit No. 5 is suitable for sub-division into two no. units) (2) ESB sub-station building (3) minor alterations to the commercial park access road and associated spur roads for access to the individual sites to that which was granted under Planning Ref. No. 17/6290 (4) Signage, car parking, site lighting, storm water attenuation systems and roof top solar PV panels and (5) all associated site development and landscape works.
Permission for retention of the constructed ESB sub-station in its current location in lieu of the location granted in Planning Register No. 17/4638.
Permission for the construction of 1 light industrial unit with ancillary office space, car parking and all associated site development and landscaping works at Unit 6, Lower Courtstown, Little Island, Cork.
Permission to construct an ESB substation building (21.8 sqm) and carry out all associated site works
The proposed development will consist of the construction of a transport depot comprising; 1)an administration and warehouse building incorporating a 2-storey administration block (495 sqm) and mezzanine store (163 sqm), truck maintenance garage (505 sqm). warehouse (511 sqm), dock leveller and rooftop photovoltaic solar panel arrays (150 sqm). 2)A service block building incorporating a boiler house (305 sqm), tank washing bays enclosure (605 sqm) truck wash enclosure (183 sqm), covered outdoor tank heating station, 2 storey administration block (148 sqm) and roof top photovoltaic solar panel arrays (75 sqm). 3)Proposed site and drainage works including a service yard, 2 no. vehicular accesses, new boundary treatments, landscape works, storage, circulation, staff parking areas with sixteen spaces including one disabled space, underground attenuation tank, underground fuel tank, 1 no. silt trap, 1 no. wash down separator, 1 no. forecourt separator, 2 no. compartment separators, 1 no. full retention separator, 1 no. 5 m high aeration tank. 1 no. 5m high balancing tank, weigh bridge, rainwater harvesting, underground pumping chamber and all other associated site development works
The brief summarizes the pattern across all 865 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/4651The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief