Executive snapshot
12% of nearby decided applications were refused. The site check found 241 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A new vehicular entrance off the L6089 to access the permitted solar farm development (Pl.Reg.No. 15/6968, as extended by Pl.Reg. No. 21/4496 and modified by Pl.Reg.No. 22/6452) including all ancillary works.
Modification to the solar farm permitted under planning reg no. 15/6968 and extended under 21/4496. The modifications consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 2 transformer stations with 1 smaller transformer station and 1 smaller storage unit, changes to the design of the delivery station, change to permitted fencing type and associated layout changes. All modifications within the boundary of the permitted development.
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15sqm), 1 no. single storey delivery station (53sqm), 2 no. single storey spare parts storage containers (15sqm each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15sqm) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
A 5 MW solar farm comprising approximately 22,200 photovoltaic panels on ground mounted frames within a site area of 8.6 hectares, 2 no. single storey inverter/transformer stations, 1 no. single storey delivery station, security fencing, CCTV, and all associated ancillary development works. - Extension of duration of permission granted under planning reference: 15/6968
Permission for the construction of an agricultural building for the housing of horses and associated site works
Private dwelling house, domestic garage and associated works.
The brief summarizes the pattern across all 241 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23/5320The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.