Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The Centre for Mental Health Care and Recovery Bantry General Hospital Carrignagat Bantry, Co. CorkOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

The Centre for Mental Health Care and Recovery Bantry General Hospital Carrignagat Bantry, Co. Cork

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

9% of nearby decided applications were refused. The site check found 329 decisions within 5 km, 25 exact-site or onsite candidate records, and 0 structured appeals.

Matched source
24/45
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

25 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

25 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Register indexed

No structured appeal row is currently tied to the matched decision set.

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

329Nearby applications
25Site-linked candidates
9%Nearby refused
0Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

24/45

Permission for demolition of a section of the existing timber panel fence with anti-climb guarding and construction of a 3m high anti-ligature, anti-climb fence

Granted0.0 km25 March 2024
23/640

Permission for the following works to existing dwelling: (i) construction of ground floor extension, (ii) construction of first floor extension, (iii) raised decking area to rear, and (iv) all associated site works

Granted0.1 km09 January 2024
22/753

The construction of new covered ambulance set down bays, new entrance into the existing hospital, minor internal reconfiguration works and the demolition of existing external ramp, along with new ambulance parking, accessible parking and all associated site development works

Granted0.1 km06 February 2023
19/603

Construction of a single storey extension circa 70SQM to the northern elevation of existing laboratory together with all associated site development works

Granted0.1 km12 November 2019
21/536

Construction of a single storey Endoscopy Unit and the construction of a single storey extension to the existing hospital to provide 16 no. beds for a Stroke Rehabilitation Unit and all associated site development works including a link from the proposed Endoscopy Unit to the existing hospital, alterations to the road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit and permission for the construction of an overflow carpark to the north of the site and associated ancillary works

Granted0.1 km17 February 2022
24/699

The construction of a two-storey building extension to the existing hospital to provide a 16-bed Rehabilitation Unit and Undercroft Plant Area at ground floor level, a 24 bed in-patient ward at first floor level and a Louvred Plant room Enclosure at roof level. Permission is also sought for refurbishment works within the ground floor of the existing hospital and the placement of a Plant room on the existing hospital roof. The works will include all associated site development works, realignment of existing parking spaces to provide additional parking, the upgrade of the adjoining landscaping and amenity areas associated with the proposed Stroke Rehabilitation Unit and In-Patient Ward building extension and permission for modifications to northern end of the existing pedestrian walkway which runs along the eastern boundary and associated ancillary works

Granted0.1 km19 February 2025

The brief summarizes the pattern across all 329 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required