Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 674 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission to construct a new dwelling house, new vehicular entrance, domestic garage, install a wastewater treatment & percolation area and all associated site works.
Permission to construct a new dwelling house.
Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area.
Permission for a 20kV underground grid connection cable in the townlands of Barryscourt, Rossmore and Ballintubbrid West, near Carrigtwohill, Co. Cork. The proposed development is intended to connect the permitted Barryscourt Solar Park (Pl. Ref. 17/4596) to the existing Carrigtwohill 38KV Substation. The Proposed development will consist of: The laying of 20kV underground electrical grid connection (c.2.45km in length), utilising both private lands and public roads, with c.1.157km in the public road (L3619), from the existing Carrigtwohill 38kV substation to the permitted Barryscourt Solar Park (Pl. ref. 17/4596). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 20kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application.
Permission for retention of the side extension as constructed to their existing dwelling house and all associated site works
1. Construction of agricultural building for the storage of straw & ancillary dry goods, agricultural machinery, along with the storage of vintage tractors & machinery for personal use. 2. Upgrading of existing entrance to the proposed development along with associated site works.
The brief summarizes the pattern across all 674 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/6436The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief