Partial coverage29 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
29 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 328 decisions within 5 km, 29 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
29 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
29 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a two-storey building extension to the existing hospital to provide a 16-bed Rehabilitation Unit and Undercroft Plant Area at ground floor level, a 24 bed in-patient ward at first floor level and a Louvred Plant room Enclosure at roof level. Permission is also sought for refurbishment works within the ground floor of the existing hospital and the placement of a Plant room on the existing hospital roof. The works will include all associated site development works, realignment of existing parking spaces to provide additional parking, the upgrade of the adjoining landscaping and amenity areas associated with the proposed Stroke Rehabilitation Unit and In-Patient Ward building extension and permission for modifications to northern end of the existing pedestrian walkway which runs along the eastern boundary and associated ancillary works
Construction of a single storey Endoscopy Unit and the construction of a single storey extension to the existing hospital to provide 16 no. beds for a Stroke Rehabilitation Unit and all associated site development works including a link from the proposed Endoscopy Unit to the existing hospital, alterations to the road layout and parking, upgrading of landscaping and amenity areas associated with the proposed Endoscopy Unit and Stroke Rehabilitation Unit and permission for the construction of an overflow carpark to the north of the site and associated ancillary works
Construction of a single storey extension circa 70SQM to the northern elevation of existing laboratory together with all associated site development works
The construction of new covered ambulance set down bays, new entrance into the existing hospital, minor internal reconfiguration works and the demolition of existing external ramp, along with new ambulance parking, accessible parking and all associated site development works
Permission for Retention of two portacabins for staff changing facilities
Permission for construction of an ESB MV substation and all associated site works
The brief summarizes the pattern across all 328 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24/699The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief